Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 72 | 205.788.125.100 | 19 | 59.275.589.385 | 72 | 205.788.125.100 | 0 | 0 |
Seleksi | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Tender Cepat | 9 | 18.205.567.500 | 1 | 650.000.000 | 9 | 18.205.567.500 | 0 | 0 |
Total | 81 | 223.993.692.600 | 20 | 59.925.589.385 | 81 | 223.993.692.600 | 0 | 0 |
Persentase | 24.69 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumber Makmur - Wonorejo (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2427317 | 22753614 | APBD | 3,780,000,000 | 3,780,000,000 | 3,728,396,587 | 3,728,396,587 | 3,727,987,000 | 3,727,987,000 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 51,603,414 | 1.37 % | |
2 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Manuntung - Lasung (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2428317 | 22749939 | APBD | 5,700,000,000 | 5,700,000,000 | 5,619,187,467 | 5,619,187,467 | 5,619,187,400 | 5,619,187,400 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 80,812,533 | 1.42 % | |
3 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Pantai Bunati (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2429317 | 22749948 | APBD | 9,750,000,000 | 9,750,000,000 | 9,559,157,255 | 9,559,157,255 | 9,558,470,000 | 9,558,470,000 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 190,842,745 | 1.96 % | |
4 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sungai Cuka - Pantai (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2430317 | 22753616 | APBD | 15,600,000,000 | 15,600,000,000 | 14,592,468,179 | 14,592,468,179 | 14,590,109,000 | 14,590,109,000 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 1,007,531,821 | 6.46 % | |
5 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pusat Pengendalian Operasional Penanggulangan Bencana (Pusdalops PB) (Lanjutan) * | Tender | Pekerjaan Konstruksi | 2431317 | 22775179 | APBD | 1,948,140,000 | 1,598,952,857 | 1,370,330,236 | 1,370,330,236 | 1,370,330,236 | 1,370,330,235 | 0 | 0 | 2020-01-10 17:00:00 | 2020-02-06 | 2020-02-27 | 81.085.012.3-731.000 | CV Aisyara Maju Bersaudara | 81.085.012.3-731.000 | CV Aisyara Maju Bersaudara | 577,809,764 | 29.66 % | |
6 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Waringin Tunggal - Tapus (DAK Penugasan) | Tender | Pekerjaan Konstruksi | 2432317 | 22735149 | APBD | 10,500,000,000 | 10,500,000,000 | 10,247,806,687 | 10,247,806,687 | 10,247,806,600 | 10,247,806,600 | 0 | 0 | 2019-12-19 16:00:00 | 2020-01-06 | 2020-01-14 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 252,193,313 | 2.4 % | |
7 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Desa Pakatellu RT. 004 (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2443317 | 22753610 | APBD | 3,930,000,000 | 3,930,000,000 | 3,737,837,187 | 3,737,837,187 | 3,726,844,000 | 3,726,844,000 | 0 | 0 | 2020-02-12 17:00:00 | 2020-02-26 | 2020-03-10 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 192,162,813 | 4.89 % | |
8 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Cappa Padang - Malewa Kec. Batulicin | Tender | Pekerjaan Konstruksi | 2445317 | 22753621 | APBD | 1,394,008,000 | 1,394,008,000 | 1,369,406,488 | 1,369,406,488 | 1,358,873,000 | 1,358,873,000 | 0 | 0 | 2020-01-27 12:00:00 | 2020-02-14 | 2020-03-03 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 24,601,512 | 1.76 % | |
9 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I Giri Mulya Sbb.6 (DAK) | Tender | Pekerjaan Konstruksi | 2448317 | 22752981 | APBD | 800,000,000 | 799,978,544 | 675,198,827 | 675,198,827 | 675,198,827 | 0 | 0 | 0 | 2020-03-03 15:00:00 | 2020-03-27 | 66.142.501.7-734.000 | sewangi island | 124,801,173 | 15.6 % | ||||
10 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I.R Anjir Baru (DAK) | Tender | Pekerjaan Konstruksi | 2449317 | 22752928 | APBD | 700,000,000 | 699,921,629 | 694,066,000 | 694,066,000 | 694,066,000 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-26 | 02.941.119.6-734.000 | CV. Jaya Engineering | 5,934,000 | 0.85 % | ||||
11 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I.R Kepayang (DAK) | Tender | Pekerjaan Konstruksi | 2450317 | 22752954 | APBD | 1,000,000,000 | 999,893,874 | 799,916,000 | 799,916,000 | 799,916,000 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-20 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 200,084,000 | 20.01 % | ||||
12 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I Serdangan (DAK) | Tender | Pekerjaan Konstruksi | 2451317 | 22752990 | APBD | 1,400,249,000 | 1,400,076,207 | 1,120,761,990 | 1,120,761,990 | 1,120,761,990 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-26 | 66.142.501.7-734.000 | sewangi island | 279,487,010 | 19.96 % | ||||
13 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I Satui Timur (DAK) | Tender | Pekerjaan Konstruksi | 2452317 | 22752964 | APBD | 2,000,000,000 | 1,999,969,591 | 1,600,138,088 | 1,600,138,088 | 1,600,138,088 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-26 | 02.918.580.8-734.000 | cv. mitraintilestari | 399,861,912 | 19.99 % | ||||
14 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Kelurahan Gunung Tinggi Kec. Batulicin Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2454317 | 22791442 | APBD | 2,281,500,000 | 2,281,499,970 | 1,876,600,000 | 1,876,600,000 | 1,876,600,000 | 0 | 0 | 0 | 2020-03-05 18:00:00 | 2020-03-26 | 02.300.423.7-734.000 | CV. HUSKOSINDO | 404,900,000 | 17.75 % | ||||
15 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Satui Barat - Setarap | Tender | Pekerjaan Konstruksi | 2463317 | 24121520 | APBD | 3,000,000,000 | 3,000,000,000 | 2,972,479,408 | 2,972,479,408 | 2,966,960,000 | 2,966,960,000 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-02-27 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 27,520,592 | 0.92 % | |
16 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Sumber Makmur | Tender | Pekerjaan Konstruksi | 2465317 | 24148062 | APBD | 1,000,000,000 | 1,000,000,000 | 995,061,714 | 995,061,714 | 994,429,000 | 994,429,000 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-02-27 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 4,938,286 | 0.49 % | |
17 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Al - Kautsar | Tender | Pekerjaan Konstruksi | 2467317 | 24115493 | APBD | 1,500,000,000 | 1,500,000,000 | 1,487,873,642 | 1,487,873,642 | 1,487,873,642 | 1,482,769,697 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-03-03 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 12,126,358 | 0.81 % | |
18 | 2020 | RSUD dr. H. ANDI ABDURRAHMAN NOOR | Beban Jasa Cleaning Service | Tender Cepat | Jasa Lainnya | 2468317 | 24391570 | BLUD | 2,307,625,000 | 2,204,125,000 | 1,818,960,000 | 1,818,960,000 | 1,818,960,000 | 1,818,960,000 | 0 | 0 | 2020-02-05 10:00:00 | 2020-02-06 | 2020-02-25 | 03.336.812.7-041.000 | PT. YUWANA EKA SEJATI SENTOSA | 03.336.812.7-041.000 | PT. YUWANA EKA SEJATI SENTOSA | 488,665,000 | 21.18 % | |
19 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jalan | Tender | Pekerjaan Konstruksi | 2470317 | 22753703 | APBD | 999,998,000 | 999,998,000 | 983,456,266 | 983,456,266 | 982,656,000 | 982,656,000 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-02-27 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 16,541,734 | 1.65 % | |
20 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di kecamatan simpang empat | Tender | Pekerjaan Konstruksi | 2474317 | 24320146 | APBD | 2,800,830,000 | 2,800,830,000 | 2,766,915,957 | 2,766,915,957 | 2,765,667,000 | 2,765,667,000 | 0 | 0 | 2020-02-18 12:00:00 | 2020-03-03 | 2020-03-11 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 33,914,043 | 1.21 % | |
21 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2476317 | 24198001 | APBD | 982,800,000 | 982,800,000 | 973,648,457 | 973,648,457 | 973,648,000 | 973,648,000 | 0 | 0 | 2020-02-18 12:00:00 | 2020-03-03 | 2020-03-11 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 9,151,543 | 0.93 % | |
22 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk PPI Kusan Hilir | Tender | Pekerjaan Konstruksi | 2478317 | 24224291 | APBD | 1,000,000,000 | 1,000,000,000 | 993,110,611 | 993,110,611 | 993,110,000 | 993,110,000 | 0 | 0 | 2020-02-18 16:00:00 | 2020-03-03 | 2020-03-11 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 6,889,389 | 0.69 % | |
23 | 2020 | BAGIAN UMUM | Publikasi Baliho | Tender | Pengadaan Barang | 2480317 | 24812855 | APBD | 2,000,000,000 | 1,998,983,800 | 1,998,007,660 | 1,998,007,660 | 1,998,007,660 | 0 | 0 | 0 | 2020-02-25 20:00:00 | 2020-03-11 | 01.463.396.0-731.000 | CV. BUDI | 1,992,340 | 0.1 % | ||||
24 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Jombang | Tender | Pekerjaan Konstruksi | 2482317 | 24048750 | APBD | 2,621,440,000 | 2,621,440,000 | 2,597,482,748 | 2,597,482,748 | 2,597,482,700 | 2,597,482,700 | 0 | 0 | 2020-02-21 11:00:00 | 2020-03-09 | 2020-03-17 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 23,957,252 | 0.91 % | |
25 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Di Kecamatan Mantewe | Tender | Pekerjaan Konstruksi | 2483317 | 24258303 | APBD | 3,285,788,800 | 3,285,788,800 | 3,251,908,975 | 3,251,908,975 | 3,250,781,848 | 3,250,781,847 | 0 | 0 | 2020-03-06 11:00:00 | 2020-03-23 | 2020-04-01 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 33,879,825 | 1.03 % | |
26 | 2020 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan KIT IPA Dasar SD dan Modul Fisika SMP | Tender | Pengadaan Barang | 2486317 | 24400185 | APBD | 4,866,582,000 | 4,856,502,485 | 4,795,635,020 | 4,795,635,020 | 4,790,070,000 | 0 | 0 | 0 | 2020-03-10 10:00:00 | 2020-05-06 | 31.507.478.1-429.000 | GRAHA MULIA UTAMA | 70,946,980 | 1.46 % | ||||
27 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan groin muara tengah pagatan Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2487317 | 22752557 | APBD | 349,974,857 | 349,866,004 | 333,333,333 | 333,333,333 | 291,745,500 | 0 | 0 | 0 | 2020-03-06 18:00:00 | 2020-03-24 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 16,641,524 | 4.76 % | ||||
28 | 2020 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan Meja dan Kursi Siswa SD dan SMP | Tender | Pengadaan Barang | 2489317 | 24399790 | APBD | 34,850,210,000 | 34,647,143,454 | 34,545,742,000 | 34,545,742,000 | 34,500,000,000 | 0 | 0 | 0 | 2020-03-02 15:00:00 | 2020-04-27 | 03.100.264.5-034.000 | PT. SHAVANA TIARAMAS | 304,468,000 | 0.87 % | ||||
29 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kec. Satui | Tender | Pekerjaan Konstruksi | 2490317 | 24058769 | APBD | 5,191,200,000 | 5,191,200,000 | 4,974,794,808 | 4,974,794,808 | 4,974,794,808 | 4,974,794,808 | 0 | 0 | 2020-03-02 17:00:00 | 2020-03-16 | 2020-03-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 216,405,192 | 4.17 % | |
30 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kodeco - Teluk Kepayang (DAK Penugasan) | Tender | Pekerjaan Konstruksi | 2491317 | 22735425 | APBD | 8,400,000,000 | 8,400,000,000 | 8,184,332,210 | 8,184,332,210 | 8,157,806,400 | 8,157,806,400 | 0 | 0 | 2020-03-02 17:00:00 | 2020-03-16 | 2020-03-24 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 215,667,790 | 2.57 % | |
31 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Angsana | Tender | Pekerjaan Konstruksi | 2492317 | 22753719 | APBD | 1,984,480,000 | 1,984,480,000 | 1,970,211,333 | 1,970,211,333 | 1,970,211,333 | 1,970,211,333 | 0 | 0 | 2020-03-04 14:00:00 | 2020-03-17 | 2020-03-26 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 14,268,667 | 0.72 % | |
32 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Karang Bintang | Tender | Pekerjaan Konstruksi | 2493317 | 24699013 | APBD | 1,896,869,700 | 1,896,869,700 | 1,880,674,983 | 1,880,674,983 | 1,880,674,983 | 1,880,674,983 | 0 | 0 | 2020-03-04 14:00:00 | 2020-03-17 | 2020-03-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 16,194,717 | 0.85 % | |
33 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2494317 | 22753775 | APBD | 2,794,480,000 | 2,794,480,000 | 2,772,443,387 | 2,772,443,387 | 2,772,443,300 | 2,772,443,300 | 0 | 0 | 2020-03-04 14:00:00 | 2020-03-17 | 2020-03-26 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 22,036,613 | 0.79 % | |
34 | 2020 | DINAS KELUARGA BERENCANA PEMBERDAYAAN PEREMPUAN DAN PERLINDUNGAN ANAK | Fisik Balai Satui | Tender | Pekerjaan Konstruksi | 2499317 | 24416347 | APBD | 614,500,000 | 614,499,734 | 491,007,439 | 491,007,439 | 491,007,439 | 0 | 0 | 0 | 2020-04-15 20:00:00 | 2020-05-13 | 91.533.662.2-734.000 | CV. Jaya Baru Kontruksi | 123,492,561 | 20.1 % | ||||
35 | 2020 | BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH | Mobil Pimpinan DPRD | Tender | Pengadaan Barang | 2500317 | 22774245 | APBD | 2,000,000,000 | 1,950,000,000 | 1,940,000,000 | 1,940,000,000 | 1,940,000,000 | 0 | 0 | 0 | 2020-04-02 19:00:00 | 2020-04-20 | 84.603.672.1-734.000 | PT SELATU KONTRAKTOR INDONESIA | 60,000,000 | 3 % | ||||
36 | 2020 | DINAS KEPEMUDAAN OLAHRAGA DAN PARIWISATA | Pekerjaan Pembuatan Jalur Pejalan Kaki (pedestrian)/Jalan Setapak | Tender | Pekerjaan Konstruksi | 2523317 | 22790425 | APBD | 391,012,853 | 391,012,765 | 312,859,063 | 312,859,063 | 312,859,063 | 0 | 0 | 0 | 2020-07-28 20:00:00 | 2020-08-19 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 78,153,790 | 19.99 % | ||||
37 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jembatan | Tender | Pekerjaan Konstruksi | 2530317 | 23826427 | APBD | 1,000,000,000 | 1,000,000,000 | 929,500,000 | 929,500,000 | 929,500,000 | 929,500,000 | 0 | 0 | 2020-04-16 16:00:00 | 2020-05-13 | 2020-05-27 | 03.271.792.8-711.000 | CV.BANGUN JAYA | 03.271.792.8-711.000 | CV.BANGUN JAYA | 70,500,000 | 7.05 % | |
38 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Perumnas Depan Pasar Minggu | Tender | Pekerjaan Konstruksi | 2531317 | 24343756 | APBD | 4,400,000,000 | 4,400,000,000 | 4,358,567,977 | 4,358,567,977 | 4,358,567,900 | 4,358,567,900 | 0 | 0 | 2020-04-03 11:00:00 | 2020-05-04 | 2020-05-13 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 41,432,023 | 0.94 % | |
39 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan RT. 8 Kelurahan Kampung Baru Kec. Simpang Empat | Tender | Pekerjaan Konstruksi | 2533317 | 24345205 | APBD | 357,394,300 | 357,394,300 | 352,103,453 | 352,103,453 | 352,103,453 | 352,103,453 | 0 | 0 | 2020-04-03 11:00:00 | 2020-05-04 | 2020-05-13 | 94.356.011.0-734.000 | Haus Berkah | 94.356.011.0-734.000 | Haus Berkah | 5,290,847 | 1.48 % | |
40 | 2020 | DINAS KESEHATAN | Belanja Pengadaan Obat Penunjang untuk Puskesmas | Tender | Pengadaan Barang | 2535317 | 25458818 | APBD | 1,000,000,000 | 999,612,252 | 972,442,000 | 972,442,000 | 971,582,290 | 971,582,290 | 0 | 0 | 2020-04-15 12:00:00 | 2020-04-30 | 2020-05-18 | 01.061.228.1-051.000 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 01.061.228.1-051.000 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 27,558,000 | 2.76 % | |
41 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Sei. Loban | Tender | Pekerjaan Konstruksi | 2537317 | 24156318 | APBD | 2,156,298,900 | 2,156,298,900 | 2,136,946,612 | 2,136,946,612 | 2,136,751,500 | 2,136,751,500 | 0 | 0 | 2020-04-03 13:00:00 | 2020-05-04 | 2020-05-13 | 94.356.011.0-734.000 | Haus Berkah | 94.356.011.0-734.000 | Haus Berkah | 19,352,288 | 0.9 % | |
42 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kec. Kusan Hulu | Tender | Pekerjaan Konstruksi | 2538317 | 24230586 | APBD | 1,087,489,510 | 1,087,479,550 | 1,075,546,355 | 1,075,546,355 | 1,075,546,355 | 1,075,546,355 | 0 | 0 | 2020-04-07 16:00:00 | 2020-05-04 | 2020-05-13 | 94.356.011.0-734.000 | Haus Berkah | 94.356.011.0-734.000 | Haus Berkah | 11,943,155 | 1.1 % | |
43 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Box Culvert 3x3 lebar 8 tipe triple | Tender | Pekerjaan Konstruksi | 2539317 | 22753623 | APBD | 700,390,733 | 700,238,800 | 566,700,076 | 566,700,076 | 566,700,076 | 566,700,076 | 0 | 0 | 2020-04-22 18:00:00 | 2020-06-15 | 2020-07-09 | 02.521.896.7-732.000 | CV RIFKI UTAMA | 02.521.896.7-732.000 | CV RIFKI UTAMA | 133,690,657 | 19.09 % | |
44 | 2020 | DINAS KESEHATAN | IPAL Puskesmas Puskesmas Pulau Tanjung/ Batulicin dan Puskesmas Perawatan Sebamban II | Tender Cepat | Pengadaan Barang | 2543317 | 25497696 | APBD | 1,500,000,000 | 1,490,300,001 | 1,484,967,000 | 1,484,967,000 | 1,484,967,000 | 1,484,967,000 | 0 | 0 | 2020-04-30 10:00:00 | 2020-05-04 | 2020-05-18 | 01.360.270.1-008.000 | PT. NAMBUR MARLATA | 01.360.270.1-008.000 | PT. NAMBUR MARLATA | 15,033,000 | 1 % | |
45 | 2020 | DINAS KESEHATAN | Mobil Ambulance PSC 119 (DAK) | Tender Cepat | Pengadaan Barang | 2551317 | 25497739 | APBD | 750,000,000 | 729,485,000 | 729,299,999 | 729,299,999 | 729,299,999 | 729,299,999 | 0 | 0 | 2020-05-28 10:00:00 | 2020-05-29 | 2020-06-10 | 31.396.540.2-435.000 | CV. Ambulance Pintar Indonesia | 31.396.540.2-435.000 | CV. Ambulance Pintar Indonesia | 20,700,001 | 2.76 % | |
46 | 2020 | DINAS PERIKANAN | Pembangunan TPI I | Tender | Pekerjaan Konstruksi | 2552317 | 22758965 | APBD | 400,000,000 | 399,251,673 | 398,000,000 | 398,000,000 | 395,874,749 | 395,874,749 | 395,874,749 | 395,874,749 | 2020-07-06 13:00:00 | 2020-08-05 | 2020-09-14 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 2,000,000 | 0.5 % | |
47 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Museum Pagatan | Tender | Pekerjaan Konstruksi | 2555317 | 22775265 | APBD | 1,146,990,000 | 1,146,989,179 | 1,097,791,048 | 1,097,791,048 | 1,090,859,000 | 1,090,859,000 | 0 | 0 | 2020-06-09 22:00:00 | 2020-07-01 | 2020-07-16 | 86.682.666.2-734.000 | CV. BUMI BORNEO KONSTRUKSI | 86.682.666.2-734.000 | CV. BUMI BORNEO KONSTRUKSI | 49,198,952 | 4.29 % | |
48 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Pelita, Pelita Permai I, Pelita Permai II dan Pesantren | Tender | Pekerjaan Konstruksi | 2561317 | 24320787 | APBD | 1,094,820,000 | 1,094,820,000 | 1,089,043,968 | 1,089,043,968 | 1,088,721,580 | 1,088,721,580 | 0 | 0 | 2020-05-04 12:00:00 | 2020-05-22 | 2020-06-05 | 92.746.905.6-731.000 | CV. LUMINTU ABADI JAYA | 92.746.905.6-731.000 | CV. LUMINTU ABADI JAYA | 5,776,032 | 0.53 % | |
49 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Penanganan pantai sungai dua laut | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2562317 | 24249870 | APBD | 300,000,000 | 299,662,000 | 278,410,000 | 278,410,000 | 278,410,000 | 0 | 0 | 0 | 2020-05-08 14:00:00 | 2020-07-08 | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 21,590,000 | 7.2 % | ||||
50 | 2020 | DINAS KESEHATAN | Mobil Ambulance Transport SG Pulau Tanjung (DAK) | Tender Cepat | Pengadaan Barang | 2567317 | 25497753 | APBD | 490,042,500 | 434,410,000 | 390,000,001 | 390,000,001 | 390,000,001 | 390,000,001 | 0 | 0 | 2020-06-18 11:00:00 | 2020-06-19 | 2020-06-25 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 100,042,500 | 20.42 % | |
51 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Kersik Putih Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2568317 | 25842707 | APBD | 3,328,845,333 | 3,328,845,149 | 2,829,500,000 | 2,829,500,000 | 2,827,498,000 | 2,827,498,000 | 0 | 0 | 2020-06-25 14:00:00 | 2020-07-16 | 2020-07-27 | 02.172.893.6-731.000 | PT IRINA PERKASA | 02.172.893.6-731.000 | PT IRINA PERKASA | 499,345,333 | 15 % | |
52 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Teluk Kepayang - Tapus | Tender | Pekerjaan Konstruksi | 2573317 | 24255434 | APBD | 2,000,000,000 | 2,000,000,000 | 1,983,738,928 | 1,983,738,928 | 1,981,390,500 | 1,981,390,500 | 0 | 0 | 2020-07-06 13:00:00 | 2020-07-23 | 2020-08-03 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 16,261,072 | 0.81 % | |
53 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Tamunih - Batu Bulan | Tender | Pekerjaan Konstruksi | 2574317 | 24252279 | APBD | 6,381,808,117 | 6,381,808,100 | 6,289,477,552 | 6,289,477,552 | 6,288,083,000 | 6,288,083,000 | 0 | 0 | 2020-07-06 12:00:00 | 2020-07-23 | 2020-08-03 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 92,330,565 | 1.45 % | |
54 | 2020 | DINAS KEPEMUDAAN OLAHRAGA DAN PARIWISATA | Pekerjaan Pembuatan Jalur Sepeda | Tender | Pekerjaan Konstruksi | 2575317 | 22790576 | APBD | 1,732,041,675 | 1,732,040,359 | 1,441,027,163 | 1,441,027,163 | 1,441,027,163 | 0 | 0 | 0 | 2020-07-28 20:00:00 | 2020-08-14 | 92.746.905.6-731.000 | CV. LUMINTU ABADI JAYA | 291,014,512 | 16.8 % | ||||
55 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Transmigrasi Nelayan Angsana | Tender | Pekerjaan Konstruksi | 2576317 | 22753721 | APBD | 600,140,000 | 600,138,900 | 594,716,559 | 594,716,559 | 594,716,000 | 594,716,000 | 0 | 0 | 2020-07-06 14:00:00 | 2020-07-23 | 2020-08-03 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 5,423,441 | 0.9 % | |
56 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Citra Permata Kec. Batulicin | Tender | Pekerjaan Konstruksi | 2577317 | 22753800 | APBD | 833,352,000 | 833,328,250 | 826,082,173 | 826,082,173 | 823,591,243 | 823,591,242 | 0 | 0 | 2020-07-06 13:00:00 | 2020-07-23 | 2020-08-03 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 7,269,827 | 0.87 % | |
57 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Selasar/Pergola Masjid Nurussalam | Tender | Pekerjaan Konstruksi | 2578317 | 22775242 | APBD | 1,214,601,656 | 1,213,467,055 | 1,190,002,508 | 1,190,002,508 | 1,190,002,500 | 1,190,002,500 | 0 | 0 | 2020-07-07 13:00:00 | 2020-08-07 | 2020-08-27 | 03.261.609.6-734.000 | CV.MULIA JASA | 03.261.609.6-734.000 | CV.MULIA JASA | 24,599,148 | 2.03 % | |
58 | 2020 | DINAS KESEHATAN | Mobil Promosi Kesehatan (DAK) | Tender Cepat | Pengadaan Barang | 2581317 | 26009039 | APBD | 600,000,000 | 600,000,000 | 599,984,000 | 599,984,000 | 599,984,000 | 599,984,000 | 0 | 0 | 2020-07-16 10:00:00 | 2020-07-17 | 2020-07-20 | 01.960.778.7-517.000 | CV. KANA KOMPUTINDO | 01.960.778.7-517.000 | CV. KANA KOMPUTINDO | 16,000 | 0 % | |
59 | 2020 | DINAS KESEHATAN | Pengadaan Alat Kedokteran Umum | Tender Cepat | Pengadaan Barang | 2582317 | 26008986 | APBD | 11,259,150,000 | 11,226,871,500 | 11,209,896,500 | 11,209,896,500 | 11,209,896,500 | 11,209,896,500 | 0 | 0 | 2020-07-17 10:00:00 | 2020-07-20 | 2020-08-24 | 81.551.801.4-034.000 | PT. JURIAH RATU AZORA | 81.551.801.4-034.000 | PT. JURIAH RATU AZORA | 49,253,500 | 0.44 % | |
60 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Kusambi Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2583317 | 25843071 | APBD | 3,328,845,333 | 3,328,845,307 | 2,738,772,996 | 2,738,772,996 | 2,738,772,996 | 2,738,772,996 | 0 | 0 | 2020-08-03 14:00:00 | 2020-08-27 | 2020-09-07 | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 590,072,337 | 17.73 % | |
61 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM IKK Mantewe untuk Desa Mantewe Kec. Mantewe Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2584317 | 26029972 | APBDP | 1,350,000,000 | 1,349,999,853 | 1,102,376,058 | 1,102,376,058 | 1,102,376,058 | 1,102,376,000 | 0 | 0 | 2020-07-23 10:30:00 | 2020-08-18 | 2020-08-28 | 03.153.872.1-734.000 | CV.ASYIRRA INDO KONSTRUKSI | 03.153.872.1-734.000 | CV.ASYIRRA INDO KONSTRUKSI | 247,623,942 | 18.34 % | |
62 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Gunung Besar Kec. Simpang Empat Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2585317 | 26029932 | APBDP | 2,250,000,000 | 2,249,994,838 | 1,912,397,120 | 1,912,397,120 | 1,912,397,120 | 1,912,397,000 | 0 | 0 | 2020-07-23 10:30:00 | 2020-08-18 | 2020-08-28 | 01.879.361.2-731.000 | CV. HIZKIA PUTRA | 01.879.361.2-731.000 | CV. HIZKIA PUTRA | 337,602,880 | 15 % | |
63 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Sarigadung Kec. Simpang Empat Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2586317 | 26029944 | APBDP | 1,350,000,000 | 1,349,999,914 | 1,201,745,375 | 1,201,745,375 | 1,201,745,375 | 1,201,745,000 | 0 | 0 | 2020-07-23 14:00:00 | 2020-08-18 | 2020-08-28 | 94.735.074.0-731.000 | CV.DANUM MAHASUR UTAMA | 94.735.074.0-731.000 | CV.DANUM MAHASUR UTAMA | 148,254,625 | 10.98 % | |
64 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Hatiif Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2587317 | 25843105 | APBD | 3,328,845,333 | 3,328,845,132 | 2,663,076,150 | 2,663,076,150 | 2,663,076,150 | 2,663,076,150 | 0 | 0 | 2020-08-03 14:30:00 | 2020-08-27 | 2020-09-07 | 02.172.893.6-731.000 | PT IRINA PERKASA | 02.172.893.6-731.000 | PT IRINA PERKASA | 665,769,183 | 20 % | |
65 | 2020 | Dinas Perdagangan dan Perindustrian Kabupaten Tanah Bumbu | Konstruksi Fisik Revitalisasi Pasar Rakyat Sudan Raya Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2592317 | 26131154 | APBN | 2,267,429,000 | 2,267,428,938 | 2,147,123,829 | 2,147,123,829 | 2,147,123,829 | 0 | 0 | 0 | 2020-09-02 17:00:00 | 2020-09-18 | 72.602.618.0-731.000 | PUCANA CIPTAYASA | 120,305,171 | 5.31 % | ||||
66 | 2020 | DINAS PERIKANAN | Perahu/Kapal Penangkap Ikan Berukuran Lebih Kecil dari 3 GT beserta Mesin, Alat Penangkapan Ikan, dan Alat Bantu Penangkapan Ikan (Dana DAK) | Tender | Pengadaan Barang | 2594317 | 26149225 | APBD | 600,000,000 | 594,132,000 | 531,839,880 | 531,839,880 | 531,839,880 | 531,839,880 | 0 | 0 | 2020-08-31 14:00:00 | 2020-09-14 | 2020-09-28 | 01.435.133.2-731.000 | CV. JATI MULYA | 01.435.133.2-731.000 | CV. JATI MULYA | 68,160,120 | 11.36 % | |
67 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Jalan Antasari, Sepunggur, Gunung Tinggi Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2595317 | 26163590 | APBDP | 1,198,950,000 | 1,198,950,000 | 1,188,867,808 | 1,188,867,808 | 1,184,153,500 | 1,184,153,500 | 0 | 0 | 2020-09-10 15:30:00 | 2020-09-23 | 2020-10-05 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 10,082,192 | 0.84 % | |
68 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Rumah Dinas Kajari Tanah Bumbu (multi years) | Tender | Pekerjaan Konstruksi | 2598317 | 26202850 | APBD;APBDP | 1,700,000,000 | 1,673,400,206 | 1,577,627,509 | 1,577,627,509 | 1,577,627,509 | 1,577,627,508 | 0 | 0 | 2020-10-08 09:00:00 | 2020-10-27 | 2020-11-13 | 02.942.301.9-731.000 | CV. Citra Maida Difa | 02.942.301.9-731.000 | CV. Citra Maida Difa | 122,372,491 | 7.2 % | |
69 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Perpipaan Distribusi Air Minum Ke RSUD dr.H.Andi Abdurrahman Noor (Multi Years) | Tender | Pekerjaan Konstruksi | 2600317 | 26198577 | APBD;APBDP | 3,000,000,000 | 2,999,999,679 | 2,399,999,743 | 2,399,999,743 | 2,399,999,743 | 2,399,999,700 | 0 | 0 | 2020-10-20 15:00:00 | 2020-11-27 | 2020-12-08 | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 600,000,257 | 20 % | |
70 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Booster Pump Gunung Tinggi (Multi Years) | Tender | Pekerjaan Konstruksi | 2601317 | 26198539 | APBD;APBDP | 1,500,000,000 | 1,499,999,677 | 1,441,038,344 | 1,441,038,344 | 1,441,038,344 | 1,441,038,343 | 0 | 0 | 2020-10-20 14:00:00 | 2020-11-12 | 2020-11-23 | 86.138.634.0-734.000 | suaka tirta banua | 86.138.634.0-734.000 | suaka tirta banua | 58,961,656 | 3.93 % | |
71 | 2020 | DINAS PERIKANAN | Pengadaan Gill Net | Tender | Pengadaan Barang | 2616317 | 26317407 | APBDP | 320,000,000 | 316,800,000 | 189,376,000 | 189,376,000 | 189,376,000 | 189,376,000 | 0 | 189,376,000 | 2020-10-23 11:00:00 | 2020-11-17 | 2020-11-26 | 94.237.221.0-601.000 | DINGGA KARYA MANDIRI | 94.237.221.0-601.000 | DINGGA KARYA MANDIRI | 130,624,000 | 40.82 % | |
72 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Kejaksaan Negeri Batulicin | Tender | Pekerjaan Konstruksi | 2622317 | 26188174 | APBDP | 427,090,000 | 427,090,000 | 422,720,631 | 422,720,631 | 421,945,000 | 421,945,000 | 0 | 0 | 2020-10-23 15:00:00 | 2020-11-09 | 2020-11-11 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 4,369,369 | 1.02 % | |
73 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Muara Tengah dan Pulau Salak Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2623317 | 26293058 | APBDP | 897,090,000 | 897,090,000 | 889,678,649 | 889,678,649 | 883,178,000 | 0 | 0 | 0 | 2020-10-23 15:30:00 | 2020-11-09 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 7,411,351 | 0.83 % | ||||
74 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Halaman Kantor Polres Tanbu | Tender | Pekerjaan Konstruksi | 2624317 | 26187610 | APBDP | 1,296,640,000 | 1,296,640,000 | 1,269,571,499 | 1,269,571,499 | 1,212,626,600 | 1,212,626,600 | 0 | 0 | 2020-10-23 15:00:00 | 2020-11-09 | 2020-11-12 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 27,068,501 | 2.09 % | |
75 | 2020 | DINAS PERUMAHAN PERMUKIMAN DAN PERTANAHAN | Global Positioning System (GPS) | Tender Cepat | Pengadaan Barang | 2625317 | 26427794 | APBDP | 650,000,000 | 650,000,000 | 637,010,000 | 637,010,000 | 637,010,000 | 0 | 0 | 0 | 2020-10-26 10:00:00 | 2020-10-27 | 02.341.903.9-086.000 | PT. ASMIN ADISENTOSA | 12,990,000 | 2 % | ||||
76 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Dadap Kec. Kusan Hulu | Tender | Pekerjaan Konstruksi | 2626317 | 26292681 | APBDP | 1,000,000,000 | 1,000,000,000 | 962,227,079 | 962,227,079 | 957,215,400 | 957,215,300 | 0 | 0 | 2020-10-23 15:00:00 | 2020-11-09 | 2020-11-13 | 01.834.015.8-734.000 | cv hari mulia | 01.834.015.8-734.000 | cv hari mulia | 37,772,921 | 3.78 % | |
77 | 2020 | DINAS PERIKANAN | Pengadaan Box Fiber | Tender Cepat | Pengadaan Barang | 2627317 | 26510476 | APBDP | 300,000,000 | 293,040,000 | 208,384,000 | 208,384,000 | 208,384,000 | 208,384,000 | 0 | 0 | 2020-11-03 10:00:00 | 2020-11-04 | 2020-11-23 | 86.597.393.7-808.000 | PT. Annur Rilangi Siengkang | 86.597.393.7-808.000 | PT. Annur Rilangi Siengkang | 91,616,000 | 30.54 % | |
78 | 2020 | DINAS KETAHANAN PANGAN | Belanja Gabah Untuk Pengisian Lumbung Pangan Masyarakat | Tender | Pengadaan Barang | 2631317 | 26512238 | APBDP | 450,000,000 | 449,746,500 | 408,030,000 | 408,030,000 | 374,535,000 | 0 | 0 | 0 | 2020-11-12 09:00:00 | 2020-11-25 | 66.218.604.8-734.000 | CV. kreasi BARAHA utama | 41,970,000 | 9.33 % | ||||
79 | 2020 | DINAS KETAHANAN PANGAN | Belanja Gabah Untuk Pengisian GCPP Kabupaten | Tender | Pengadaan Barang | 2632317 | 26365825 | APBDP | 375,000,000 | 374,788,750 | 334,950,000 | 334,950,000 | 309,575,000 | 0 | 0 | 0 | 2020-11-12 09:00:00 | 2020-11-25 | 66.218.604.8-734.000 | CV. kreasi BARAHA utama | 40,050,000 | 10.68 % | ||||
80 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan 2 Unit Blok Hunian Lapas Batulicin (multi years) | Tender | Pekerjaan Konstruksi | 2633317 | 26202945 | APBD;APBDP | 6,100,000,000 | 6,096,602,630 | 5,477,114,678 | 5,477,114,678 | 5,477,114,678 | 5,477,114,600 | 0 | 0 | 2020-11-17 10:30:00 | 2020-12-02 | 2020-12-28 | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 622,885,322 | 10.21 % | |
81 | 2020 | DINAS PERIKANAN | Pengadaan Gill Net Lengkap/Rempa Kepiting | Tender Cepat | Pengadaan Barang | 2635317 | 26727222 | APBDP | 348,750,000 | 341,000,000 | 316,959,500 | 316,959,500 | 316,959,500 | 316,959,500 | 0 | 0 | 2020-11-24 15:00:00 | 2020-11-25 | 2020-11-30 | 75.964.520.3-603.000 | CV.ANGKASA JAYA TEKNIK | 75.964.520.3-603.000 | CV.ANGKASA JAYA TEKNIK | 31,790,500 | 9.12 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumber Makmur - Wonorejo (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2427317 | 22753614 | APBD | 3,780,000,000 | 3,780,000,000 | 3,728,396,587 | 3,728,396,587 | 3,727,987,000 | 3,727,987,000 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 51,603,414 | 1.37 % | |
2 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Manuntung - Lasung (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2428317 | 22749939 | APBD | 5,700,000,000 | 5,700,000,000 | 5,619,187,467 | 5,619,187,467 | 5,619,187,400 | 5,619,187,400 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 80,812,533 | 1.42 % | |
3 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Pantai Bunati (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2429317 | 22749948 | APBD | 9,750,000,000 | 9,750,000,000 | 9,559,157,255 | 9,559,157,255 | 9,558,470,000 | 9,558,470,000 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 190,842,745 | 1.96 % | |
4 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sungai Cuka - Pantai (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2430317 | 22753616 | APBD | 15,600,000,000 | 15,600,000,000 | 14,592,468,179 | 14,592,468,179 | 14,590,109,000 | 14,590,109,000 | 0 | 0 | 2019-12-18 18:00:00 | 2020-01-06 | 2020-01-14 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 1,007,531,821 | 6.46 % | |
5 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pusat Pengendalian Operasional Penanggulangan Bencana (Pusdalops PB) (Lanjutan) * | Tender | Pekerjaan Konstruksi | 2431317 | 22775179 | APBD | 1,948,140,000 | 1,598,952,857 | 1,370,330,236 | 1,370,330,236 | 1,370,330,236 | 1,370,330,235 | 0 | 0 | 2020-01-10 17:00:00 | 2020-02-06 | 2020-02-27 | 81.085.012.3-731.000 | CV Aisyara Maju Bersaudara | 81.085.012.3-731.000 | CV Aisyara Maju Bersaudara | 577,809,764 | 29.66 % | |
6 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Waringin Tunggal - Tapus (DAK Penugasan) | Tender | Pekerjaan Konstruksi | 2432317 | 22735149 | APBD | 10,500,000,000 | 10,500,000,000 | 10,247,806,687 | 10,247,806,687 | 10,247,806,600 | 10,247,806,600 | 0 | 0 | 2019-12-19 16:00:00 | 2020-01-06 | 2020-01-14 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 252,193,313 | 2.4 % | |
7 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Desa Pakatellu RT. 004 (DAK Reguler) | Tender | Pekerjaan Konstruksi | 2443317 | 22753610 | APBD | 3,930,000,000 | 3,930,000,000 | 3,737,837,187 | 3,737,837,187 | 3,726,844,000 | 3,726,844,000 | 0 | 0 | 2020-02-12 17:00:00 | 2020-02-26 | 2020-03-10 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 192,162,813 | 4.89 % | |
8 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Cappa Padang - Malewa Kec. Batulicin | Tender | Pekerjaan Konstruksi | 2445317 | 22753621 | APBD | 1,394,008,000 | 1,394,008,000 | 1,369,406,488 | 1,369,406,488 | 1,358,873,000 | 1,358,873,000 | 0 | 0 | 2020-01-27 12:00:00 | 2020-02-14 | 2020-03-03 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 24,601,512 | 1.76 % | |
9 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I Giri Mulya Sbb.6 (DAK) | Tender | Pekerjaan Konstruksi | 2448317 | 22752981 | APBD | 800,000,000 | 799,978,544 | 675,198,827 | 675,198,827 | 675,198,827 | 0 | 0 | 0 | 2020-03-03 15:00:00 | 2020-03-27 | 66.142.501.7-734.000 | sewangi island | 124,801,173 | 15.6 % | ||||
10 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I.R Anjir Baru (DAK) | Tender | Pekerjaan Konstruksi | 2449317 | 22752928 | APBD | 700,000,000 | 699,921,629 | 694,066,000 | 694,066,000 | 694,066,000 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-26 | 02.941.119.6-734.000 | CV. Jaya Engineering | 5,934,000 | 0.85 % | ||||
11 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I.R Kepayang (DAK) | Tender | Pekerjaan Konstruksi | 2450317 | 22752954 | APBD | 1,000,000,000 | 999,893,874 | 799,916,000 | 799,916,000 | 799,916,000 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-20 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 200,084,000 | 20.01 % | ||||
12 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I Serdangan (DAK) | Tender | Pekerjaan Konstruksi | 2451317 | 22752990 | APBD | 1,400,249,000 | 1,400,076,207 | 1,120,761,990 | 1,120,761,990 | 1,120,761,990 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-26 | 66.142.501.7-734.000 | sewangi island | 279,487,010 | 19.96 % | ||||
13 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi D.I Satui Timur (DAK) | Tender | Pekerjaan Konstruksi | 2452317 | 22752964 | APBD | 2,000,000,000 | 1,999,969,591 | 1,600,138,088 | 1,600,138,088 | 1,600,138,088 | 0 | 0 | 0 | 2020-03-04 15:00:00 | 2020-03-26 | 02.918.580.8-734.000 | cv. mitraintilestari | 399,861,912 | 19.99 % | ||||
14 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Kelurahan Gunung Tinggi Kec. Batulicin Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2454317 | 22791442 | APBD | 2,281,500,000 | 2,281,499,970 | 1,876,600,000 | 1,876,600,000 | 1,876,600,000 | 0 | 0 | 0 | 2020-03-05 18:00:00 | 2020-03-26 | 02.300.423.7-734.000 | CV. HUSKOSINDO | 404,900,000 | 17.75 % | ||||
15 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Satui Barat - Setarap | Tender | Pekerjaan Konstruksi | 2463317 | 24121520 | APBD | 3,000,000,000 | 3,000,000,000 | 2,972,479,408 | 2,972,479,408 | 2,966,960,000 | 2,966,960,000 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-02-27 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 27,520,592 | 0.92 % | |
16 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Sumber Makmur | Tender | Pekerjaan Konstruksi | 2465317 | 24148062 | APBD | 1,000,000,000 | 1,000,000,000 | 995,061,714 | 995,061,714 | 994,429,000 | 994,429,000 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-02-27 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 4,938,286 | 0.49 % | |
17 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Al - Kautsar | Tender | Pekerjaan Konstruksi | 2467317 | 24115493 | APBD | 1,500,000,000 | 1,500,000,000 | 1,487,873,642 | 1,487,873,642 | 1,487,873,642 | 1,482,769,697 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-03-03 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 12,126,358 | 0.81 % | |
18 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jalan | Tender | Pekerjaan Konstruksi | 2470317 | 22753703 | APBD | 999,998,000 | 999,998,000 | 983,456,266 | 983,456,266 | 982,656,000 | 982,656,000 | 0 | 0 | 2020-02-07 18:00:00 | 2020-02-21 | 2020-02-27 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 16,541,734 | 1.65 % | |
19 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di kecamatan simpang empat | Tender | Pekerjaan Konstruksi | 2474317 | 24320146 | APBD | 2,800,830,000 | 2,800,830,000 | 2,766,915,957 | 2,766,915,957 | 2,765,667,000 | 2,765,667,000 | 0 | 0 | 2020-02-18 12:00:00 | 2020-03-03 | 2020-03-11 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 33,914,043 | 1.21 % | |
20 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2476317 | 24198001 | APBD | 982,800,000 | 982,800,000 | 973,648,457 | 973,648,457 | 973,648,000 | 973,648,000 | 0 | 0 | 2020-02-18 12:00:00 | 2020-03-03 | 2020-03-11 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 9,151,543 | 0.93 % | |
21 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk PPI Kusan Hilir | Tender | Pekerjaan Konstruksi | 2478317 | 24224291 | APBD | 1,000,000,000 | 1,000,000,000 | 993,110,611 | 993,110,611 | 993,110,000 | 993,110,000 | 0 | 0 | 2020-02-18 16:00:00 | 2020-03-03 | 2020-03-11 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 6,889,389 | 0.69 % | |
22 | 2020 | BAGIAN UMUM | Publikasi Baliho | Tender | Pengadaan Barang | 2480317 | 24812855 | APBD | 2,000,000,000 | 1,998,983,800 | 1,998,007,660 | 1,998,007,660 | 1,998,007,660 | 0 | 0 | 0 | 2020-02-25 20:00:00 | 2020-03-11 | 01.463.396.0-731.000 | CV. BUDI | 1,992,340 | 0.1 % | ||||
23 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Jombang | Tender | Pekerjaan Konstruksi | 2482317 | 24048750 | APBD | 2,621,440,000 | 2,621,440,000 | 2,597,482,748 | 2,597,482,748 | 2,597,482,700 | 2,597,482,700 | 0 | 0 | 2020-02-21 11:00:00 | 2020-03-09 | 2020-03-17 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 23,957,252 | 0.91 % | |
24 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Di Kecamatan Mantewe | Tender | Pekerjaan Konstruksi | 2483317 | 24258303 | APBD | 3,285,788,800 | 3,285,788,800 | 3,251,908,975 | 3,251,908,975 | 3,250,781,848 | 3,250,781,847 | 0 | 0 | 2020-03-06 11:00:00 | 2020-03-23 | 2020-04-01 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 33,879,825 | 1.03 % | |
25 | 2020 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan KIT IPA Dasar SD dan Modul Fisika SMP | Tender | Pengadaan Barang | 2486317 | 24400185 | APBD | 4,866,582,000 | 4,856,502,485 | 4,795,635,020 | 4,795,635,020 | 4,790,070,000 | 0 | 0 | 0 | 2020-03-10 10:00:00 | 2020-05-06 | 31.507.478.1-429.000 | GRAHA MULIA UTAMA | 70,946,980 | 1.46 % | ||||
26 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan groin muara tengah pagatan Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2487317 | 22752557 | APBD | 349,974,857 | 349,866,004 | 333,333,333 | 333,333,333 | 291,745,500 | 0 | 0 | 0 | 2020-03-06 18:00:00 | 2020-03-24 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 16,641,524 | 4.76 % | ||||
27 | 2020 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan Meja dan Kursi Siswa SD dan SMP | Tender | Pengadaan Barang | 2489317 | 24399790 | APBD | 34,850,210,000 | 34,647,143,454 | 34,545,742,000 | 34,545,742,000 | 34,500,000,000 | 0 | 0 | 0 | 2020-03-02 15:00:00 | 2020-04-27 | 03.100.264.5-034.000 | PT. SHAVANA TIARAMAS | 304,468,000 | 0.87 % | ||||
28 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kec. Satui | Tender | Pekerjaan Konstruksi | 2490317 | 24058769 | APBD | 5,191,200,000 | 5,191,200,000 | 4,974,794,808 | 4,974,794,808 | 4,974,794,808 | 4,974,794,808 | 0 | 0 | 2020-03-02 17:00:00 | 2020-03-16 | 2020-03-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 216,405,192 | 4.17 % | |
29 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kodeco - Teluk Kepayang (DAK Penugasan) | Tender | Pekerjaan Konstruksi | 2491317 | 22735425 | APBD | 8,400,000,000 | 8,400,000,000 | 8,184,332,210 | 8,184,332,210 | 8,157,806,400 | 8,157,806,400 | 0 | 0 | 2020-03-02 17:00:00 | 2020-03-16 | 2020-03-24 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 215,667,790 | 2.57 % | |
30 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Angsana | Tender | Pekerjaan Konstruksi | 2492317 | 22753719 | APBD | 1,984,480,000 | 1,984,480,000 | 1,970,211,333 | 1,970,211,333 | 1,970,211,333 | 1,970,211,333 | 0 | 0 | 2020-03-04 14:00:00 | 2020-03-17 | 2020-03-26 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 14,268,667 | 0.72 % | |
31 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Karang Bintang | Tender | Pekerjaan Konstruksi | 2493317 | 24699013 | APBD | 1,896,869,700 | 1,896,869,700 | 1,880,674,983 | 1,880,674,983 | 1,880,674,983 | 1,880,674,983 | 0 | 0 | 2020-03-04 14:00:00 | 2020-03-17 | 2020-03-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 16,194,717 | 0.85 % | |
32 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2494317 | 22753775 | APBD | 2,794,480,000 | 2,794,480,000 | 2,772,443,387 | 2,772,443,387 | 2,772,443,300 | 2,772,443,300 | 0 | 0 | 2020-03-04 14:00:00 | 2020-03-17 | 2020-03-26 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 22,036,613 | 0.79 % | |
33 | 2020 | DINAS KELUARGA BERENCANA PEMBERDAYAAN PEREMPUAN DAN PERLINDUNGAN ANAK | Fisik Balai Satui | Tender | Pekerjaan Konstruksi | 2499317 | 24416347 | APBD | 614,500,000 | 614,499,734 | 491,007,439 | 491,007,439 | 491,007,439 | 0 | 0 | 0 | 2020-04-15 20:00:00 | 2020-05-13 | 91.533.662.2-734.000 | CV. Jaya Baru Kontruksi | 123,492,561 | 20.1 % | ||||
34 | 2020 | BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH | Mobil Pimpinan DPRD | Tender | Pengadaan Barang | 2500317 | 22774245 | APBD | 2,000,000,000 | 1,950,000,000 | 1,940,000,000 | 1,940,000,000 | 1,940,000,000 | 0 | 0 | 0 | 2020-04-02 19:00:00 | 2020-04-20 | 84.603.672.1-734.000 | PT SELATU KONTRAKTOR INDONESIA | 60,000,000 | 3 % | ||||
35 | 2020 | DINAS KEPEMUDAAN OLAHRAGA DAN PARIWISATA | Pekerjaan Pembuatan Jalur Pejalan Kaki (pedestrian)/Jalan Setapak | Tender | Pekerjaan Konstruksi | 2523317 | 22790425 | APBD | 391,012,853 | 391,012,765 | 312,859,063 | 312,859,063 | 312,859,063 | 0 | 0 | 0 | 2020-07-28 20:00:00 | 2020-08-19 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 78,153,790 | 19.99 % | ||||
36 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jembatan | Tender | Pekerjaan Konstruksi | 2530317 | 23826427 | APBD | 1,000,000,000 | 1,000,000,000 | 929,500,000 | 929,500,000 | 929,500,000 | 929,500,000 | 0 | 0 | 2020-04-16 16:00:00 | 2020-05-13 | 2020-05-27 | 03.271.792.8-711.000 | CV.BANGUN JAYA | 03.271.792.8-711.000 | CV.BANGUN JAYA | 70,500,000 | 7.05 % | |
37 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Perumnas Depan Pasar Minggu | Tender | Pekerjaan Konstruksi | 2531317 | 24343756 | APBD | 4,400,000,000 | 4,400,000,000 | 4,358,567,977 | 4,358,567,977 | 4,358,567,900 | 4,358,567,900 | 0 | 0 | 2020-04-03 11:00:00 | 2020-05-04 | 2020-05-13 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 41,432,023 | 0.94 % | |
38 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan RT. 8 Kelurahan Kampung Baru Kec. Simpang Empat | Tender | Pekerjaan Konstruksi | 2533317 | 24345205 | APBD | 357,394,300 | 357,394,300 | 352,103,453 | 352,103,453 | 352,103,453 | 352,103,453 | 0 | 0 | 2020-04-03 11:00:00 | 2020-05-04 | 2020-05-13 | 94.356.011.0-734.000 | Haus Berkah | 94.356.011.0-734.000 | Haus Berkah | 5,290,847 | 1.48 % | |
39 | 2020 | DINAS KESEHATAN | Belanja Pengadaan Obat Penunjang untuk Puskesmas | Tender | Pengadaan Barang | 2535317 | 25458818 | APBD | 1,000,000,000 | 999,612,252 | 972,442,000 | 972,442,000 | 971,582,290 | 971,582,290 | 0 | 0 | 2020-04-15 12:00:00 | 2020-04-30 | 2020-05-18 | 01.061.228.1-051.000 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 01.061.228.1-051.000 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 27,558,000 | 2.76 % | |
40 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Sei. Loban | Tender | Pekerjaan Konstruksi | 2537317 | 24156318 | APBD | 2,156,298,900 | 2,156,298,900 | 2,136,946,612 | 2,136,946,612 | 2,136,751,500 | 2,136,751,500 | 0 | 0 | 2020-04-03 13:00:00 | 2020-05-04 | 2020-05-13 | 94.356.011.0-734.000 | Haus Berkah | 94.356.011.0-734.000 | Haus Berkah | 19,352,288 | 0.9 % | |
41 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kec. Kusan Hulu | Tender | Pekerjaan Konstruksi | 2538317 | 24230586 | APBD | 1,087,489,510 | 1,087,479,550 | 1,075,546,355 | 1,075,546,355 | 1,075,546,355 | 1,075,546,355 | 0 | 0 | 2020-04-07 16:00:00 | 2020-05-04 | 2020-05-13 | 94.356.011.0-734.000 | Haus Berkah | 94.356.011.0-734.000 | Haus Berkah | 11,943,155 | 1.1 % | |
42 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Box Culvert 3x3 lebar 8 tipe triple | Tender | Pekerjaan Konstruksi | 2539317 | 22753623 | APBD | 700,390,733 | 700,238,800 | 566,700,076 | 566,700,076 | 566,700,076 | 566,700,076 | 0 | 0 | 2020-04-22 18:00:00 | 2020-06-15 | 2020-07-09 | 02.521.896.7-732.000 | CV RIFKI UTAMA | 02.521.896.7-732.000 | CV RIFKI UTAMA | 133,690,657 | 19.09 % | |
43 | 2020 | DINAS PERIKANAN | Pembangunan TPI I | Tender | Pekerjaan Konstruksi | 2552317 | 22758965 | APBD | 400,000,000 | 399,251,673 | 398,000,000 | 398,000,000 | 395,874,749 | 395,874,749 | 395,874,749 | 395,874,749 | 2020-07-06 13:00:00 | 2020-08-05 | 2020-09-14 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 2,000,000 | 0.5 % | |
44 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Museum Pagatan | Tender | Pekerjaan Konstruksi | 2555317 | 22775265 | APBD | 1,146,990,000 | 1,146,989,179 | 1,097,791,048 | 1,097,791,048 | 1,090,859,000 | 1,090,859,000 | 0 | 0 | 2020-06-09 22:00:00 | 2020-07-01 | 2020-07-16 | 86.682.666.2-734.000 | CV. BUMI BORNEO KONSTRUKSI | 86.682.666.2-734.000 | CV. BUMI BORNEO KONSTRUKSI | 49,198,952 | 4.29 % | |
45 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Pelita, Pelita Permai I, Pelita Permai II dan Pesantren | Tender | Pekerjaan Konstruksi | 2561317 | 24320787 | APBD | 1,094,820,000 | 1,094,820,000 | 1,089,043,968 | 1,089,043,968 | 1,088,721,580 | 1,088,721,580 | 0 | 0 | 2020-05-04 12:00:00 | 2020-05-22 | 2020-06-05 | 92.746.905.6-731.000 | CV. LUMINTU ABADI JAYA | 92.746.905.6-731.000 | CV. LUMINTU ABADI JAYA | 5,776,032 | 0.53 % | |
46 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Penanganan pantai sungai dua laut | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2562317 | 24249870 | APBD | 300,000,000 | 299,662,000 | 278,410,000 | 278,410,000 | 278,410,000 | 0 | 0 | 0 | 2020-05-08 14:00:00 | 2020-07-08 | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 21,590,000 | 7.2 % | ||||
47 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Kersik Putih Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2568317 | 25842707 | APBD | 3,328,845,333 | 3,328,845,149 | 2,829,500,000 | 2,829,500,000 | 2,827,498,000 | 2,827,498,000 | 0 | 0 | 2020-06-25 14:00:00 | 2020-07-16 | 2020-07-27 | 02.172.893.6-731.000 | PT IRINA PERKASA | 02.172.893.6-731.000 | PT IRINA PERKASA | 499,345,333 | 15 % | |
48 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Teluk Kepayang - Tapus | Tender | Pekerjaan Konstruksi | 2573317 | 24255434 | APBD | 2,000,000,000 | 2,000,000,000 | 1,983,738,928 | 1,983,738,928 | 1,981,390,500 | 1,981,390,500 | 0 | 0 | 2020-07-06 13:00:00 | 2020-07-23 | 2020-08-03 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 16,261,072 | 0.81 % | |
49 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Tamunih - Batu Bulan | Tender | Pekerjaan Konstruksi | 2574317 | 24252279 | APBD | 6,381,808,117 | 6,381,808,100 | 6,289,477,552 | 6,289,477,552 | 6,288,083,000 | 6,288,083,000 | 0 | 0 | 2020-07-06 12:00:00 | 2020-07-23 | 2020-08-03 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 92,330,565 | 1.45 % | |
50 | 2020 | DINAS KEPEMUDAAN OLAHRAGA DAN PARIWISATA | Pekerjaan Pembuatan Jalur Sepeda | Tender | Pekerjaan Konstruksi | 2575317 | 22790576 | APBD | 1,732,041,675 | 1,732,040,359 | 1,441,027,163 | 1,441,027,163 | 1,441,027,163 | 0 | 0 | 0 | 2020-07-28 20:00:00 | 2020-08-14 | 92.746.905.6-731.000 | CV. LUMINTU ABADI JAYA | 291,014,512 | 16.8 % | ||||
51 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Transmigrasi Nelayan Angsana | Tender | Pekerjaan Konstruksi | 2576317 | 22753721 | APBD | 600,140,000 | 600,138,900 | 594,716,559 | 594,716,559 | 594,716,000 | 594,716,000 | 0 | 0 | 2020-07-06 14:00:00 | 2020-07-23 | 2020-08-03 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 5,423,441 | 0.9 % | |
52 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Citra Permata Kec. Batulicin | Tender | Pekerjaan Konstruksi | 2577317 | 22753800 | APBD | 833,352,000 | 833,328,250 | 826,082,173 | 826,082,173 | 823,591,243 | 823,591,242 | 0 | 0 | 2020-07-06 13:00:00 | 2020-07-23 | 2020-08-03 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 7,269,827 | 0.87 % | |
53 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Selasar/Pergola Masjid Nurussalam | Tender | Pekerjaan Konstruksi | 2578317 | 22775242 | APBD | 1,214,601,656 | 1,213,467,055 | 1,190,002,508 | 1,190,002,508 | 1,190,002,500 | 1,190,002,500 | 0 | 0 | 2020-07-07 13:00:00 | 2020-08-07 | 2020-08-27 | 03.261.609.6-734.000 | CV.MULIA JASA | 03.261.609.6-734.000 | CV.MULIA JASA | 24,599,148 | 2.03 % | |
54 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Kusambi Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2583317 | 25843071 | APBD | 3,328,845,333 | 3,328,845,307 | 2,738,772,996 | 2,738,772,996 | 2,738,772,996 | 2,738,772,996 | 0 | 0 | 2020-08-03 14:00:00 | 2020-08-27 | 2020-09-07 | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 590,072,337 | 17.73 % | |
55 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM IKK Mantewe untuk Desa Mantewe Kec. Mantewe Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2584317 | 26029972 | APBDP | 1,350,000,000 | 1,349,999,853 | 1,102,376,058 | 1,102,376,058 | 1,102,376,058 | 1,102,376,000 | 0 | 0 | 2020-07-23 10:30:00 | 2020-08-18 | 2020-08-28 | 03.153.872.1-734.000 | CV.ASYIRRA INDO KONSTRUKSI | 03.153.872.1-734.000 | CV.ASYIRRA INDO KONSTRUKSI | 247,623,942 | 18.34 % | |
56 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Gunung Besar Kec. Simpang Empat Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2585317 | 26029932 | APBDP | 2,250,000,000 | 2,249,994,838 | 1,912,397,120 | 1,912,397,120 | 1,912,397,120 | 1,912,397,000 | 0 | 0 | 2020-07-23 10:30:00 | 2020-08-18 | 2020-08-28 | 01.879.361.2-731.000 | CV. HIZKIA PUTRA | 01.879.361.2-731.000 | CV. HIZKIA PUTRA | 337,602,880 | 15 % | |
57 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Sarigadung Kec. Simpang Empat Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2586317 | 26029944 | APBDP | 1,350,000,000 | 1,349,999,914 | 1,201,745,375 | 1,201,745,375 | 1,201,745,375 | 1,201,745,000 | 0 | 0 | 2020-07-23 14:00:00 | 2020-08-18 | 2020-08-28 | 94.735.074.0-731.000 | CV.DANUM MAHASUR UTAMA | 94.735.074.0-731.000 | CV.DANUM MAHASUR UTAMA | 148,254,625 | 10.98 % | |
58 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Hatiif Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2587317 | 25843105 | APBD | 3,328,845,333 | 3,328,845,132 | 2,663,076,150 | 2,663,076,150 | 2,663,076,150 | 2,663,076,150 | 0 | 0 | 2020-08-03 14:30:00 | 2020-08-27 | 2020-09-07 | 02.172.893.6-731.000 | PT IRINA PERKASA | 02.172.893.6-731.000 | PT IRINA PERKASA | 665,769,183 | 20 % | |
59 | 2020 | Dinas Perdagangan dan Perindustrian Kabupaten Tanah Bumbu | Konstruksi Fisik Revitalisasi Pasar Rakyat Sudan Raya Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2592317 | 26131154 | APBN | 2,267,429,000 | 2,267,428,938 | 2,147,123,829 | 2,147,123,829 | 2,147,123,829 | 0 | 0 | 0 | 2020-09-02 17:00:00 | 2020-09-18 | 72.602.618.0-731.000 | PUCANA CIPTAYASA | 120,305,171 | 5.31 % | ||||
60 | 2020 | DINAS PERIKANAN | Perahu/Kapal Penangkap Ikan Berukuran Lebih Kecil dari 3 GT beserta Mesin, Alat Penangkapan Ikan, dan Alat Bantu Penangkapan Ikan (Dana DAK) | Tender | Pengadaan Barang | 2594317 | 26149225 | APBD | 600,000,000 | 594,132,000 | 531,839,880 | 531,839,880 | 531,839,880 | 531,839,880 | 0 | 0 | 2020-08-31 14:00:00 | 2020-09-14 | 2020-09-28 | 01.435.133.2-731.000 | CV. JATI MULYA | 01.435.133.2-731.000 | CV. JATI MULYA | 68,160,120 | 11.36 % | |
61 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Jalan Antasari, Sepunggur, Gunung Tinggi Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2595317 | 26163590 | APBDP | 1,198,950,000 | 1,198,950,000 | 1,188,867,808 | 1,188,867,808 | 1,184,153,500 | 1,184,153,500 | 0 | 0 | 2020-09-10 15:30:00 | 2020-09-23 | 2020-10-05 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 10,082,192 | 0.84 % | |
62 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Rumah Dinas Kajari Tanah Bumbu (multi years) | Tender | Pekerjaan Konstruksi | 2598317 | 26202850 | APBD;APBDP | 1,700,000,000 | 1,673,400,206 | 1,577,627,509 | 1,577,627,509 | 1,577,627,509 | 1,577,627,508 | 0 | 0 | 2020-10-08 09:00:00 | 2020-10-27 | 2020-11-13 | 02.942.301.9-731.000 | CV. Citra Maida Difa | 02.942.301.9-731.000 | CV. Citra Maida Difa | 122,372,491 | 7.2 % | |
63 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Perpipaan Distribusi Air Minum Ke RSUD dr.H.Andi Abdurrahman Noor (Multi Years) | Tender | Pekerjaan Konstruksi | 2600317 | 26198577 | APBD;APBDP | 3,000,000,000 | 2,999,999,679 | 2,399,999,743 | 2,399,999,743 | 2,399,999,743 | 2,399,999,700 | 0 | 0 | 2020-10-20 15:00:00 | 2020-11-27 | 2020-12-08 | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 600,000,257 | 20 % | |
64 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Booster Pump Gunung Tinggi (Multi Years) | Tender | Pekerjaan Konstruksi | 2601317 | 26198539 | APBD;APBDP | 1,500,000,000 | 1,499,999,677 | 1,441,038,344 | 1,441,038,344 | 1,441,038,344 | 1,441,038,343 | 0 | 0 | 2020-10-20 14:00:00 | 2020-11-12 | 2020-11-23 | 86.138.634.0-734.000 | suaka tirta banua | 86.138.634.0-734.000 | suaka tirta banua | 58,961,656 | 3.93 % | |
65 | 2020 | DINAS PERIKANAN | Pengadaan Gill Net | Tender | Pengadaan Barang | 2616317 | 26317407 | APBDP | 320,000,000 | 316,800,000 | 189,376,000 | 189,376,000 | 189,376,000 | 189,376,000 | 0 | 189,376,000 | 2020-10-23 11:00:00 | 2020-11-17 | 2020-11-26 | 94.237.221.0-601.000 | DINGGA KARYA MANDIRI | 94.237.221.0-601.000 | DINGGA KARYA MANDIRI | 130,624,000 | 40.82 % | |
66 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Kejaksaan Negeri Batulicin | Tender | Pekerjaan Konstruksi | 2622317 | 26188174 | APBDP | 427,090,000 | 427,090,000 | 422,720,631 | 422,720,631 | 421,945,000 | 421,945,000 | 0 | 0 | 2020-10-23 15:00:00 | 2020-11-09 | 2020-11-11 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 4,369,369 | 1.02 % | |
67 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Muara Tengah dan Pulau Salak Kec. Kusan Hilir | Tender | Pekerjaan Konstruksi | 2623317 | 26293058 | APBDP | 897,090,000 | 897,090,000 | 889,678,649 | 889,678,649 | 883,178,000 | 0 | 0 | 0 | 2020-10-23 15:30:00 | 2020-11-09 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 7,411,351 | 0.83 % | ||||
68 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Halaman Kantor Polres Tanbu | Tender | Pekerjaan Konstruksi | 2624317 | 26187610 | APBDP | 1,296,640,000 | 1,296,640,000 | 1,269,571,499 | 1,269,571,499 | 1,212,626,600 | 1,212,626,600 | 0 | 0 | 2020-10-23 15:00:00 | 2020-11-09 | 2020-11-12 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 27,068,501 | 2.09 % | |
69 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Dadap Kec. Kusan Hulu | Tender | Pekerjaan Konstruksi | 2626317 | 26292681 | APBDP | 1,000,000,000 | 1,000,000,000 | 962,227,079 | 962,227,079 | 957,215,400 | 957,215,300 | 0 | 0 | 2020-10-23 15:00:00 | 2020-11-09 | 2020-11-13 | 01.834.015.8-734.000 | cv hari mulia | 01.834.015.8-734.000 | cv hari mulia | 37,772,921 | 3.78 % | |
70 | 2020 | DINAS KETAHANAN PANGAN | Belanja Gabah Untuk Pengisian Lumbung Pangan Masyarakat | Tender | Pengadaan Barang | 2631317 | 26512238 | APBDP | 450,000,000 | 449,746,500 | 408,030,000 | 408,030,000 | 374,535,000 | 0 | 0 | 0 | 2020-11-12 09:00:00 | 2020-11-25 | 66.218.604.8-734.000 | CV. kreasi BARAHA utama | 41,970,000 | 9.33 % | ||||
71 | 2020 | DINAS KETAHANAN PANGAN | Belanja Gabah Untuk Pengisian GCPP Kabupaten | Tender | Pengadaan Barang | 2632317 | 26365825 | APBDP | 375,000,000 | 374,788,750 | 334,950,000 | 334,950,000 | 309,575,000 | 0 | 0 | 0 | 2020-11-12 09:00:00 | 2020-11-25 | 66.218.604.8-734.000 | CV. kreasi BARAHA utama | 40,050,000 | 10.68 % | ||||
72 | 2020 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan 2 Unit Blok Hunian Lapas Batulicin (multi years) | Tender | Pekerjaan Konstruksi | 2633317 | 26202945 | APBD;APBDP | 6,100,000,000 | 6,096,602,630 | 5,477,114,678 | 5,477,114,678 | 5,477,114,678 | 5,477,114,600 | 0 | 0 | 2020-11-17 10:30:00 | 2020-12-02 | 2020-12-28 | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 622,885,322 | 10.21 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2020 | RSUD dr. H. ANDI ABDURRAHMAN NOOR | Beban Jasa Cleaning Service | Tender Cepat | Jasa Lainnya | 2468317 | 24391570 | BLUD | 2,307,625,000 | 2,204,125,000 | 1,818,960,000 | 1,818,960,000 | 1,818,960,000 | 1,818,960,000 | 0 | 0 | 2020-02-05 10:00:00 | 2020-02-06 | 2020-02-25 | 03.336.812.7-041.000 | PT. YUWANA EKA SEJATI SENTOSA | 03.336.812.7-041.000 | PT. YUWANA EKA SEJATI SENTOSA | 488,665,000 | 21.18 % | |
2 | 2020 | DINAS KESEHATAN | IPAL Puskesmas Puskesmas Pulau Tanjung/ Batulicin dan Puskesmas Perawatan Sebamban II | Tender Cepat | Pengadaan Barang | 2543317 | 25497696 | APBD | 1,500,000,000 | 1,490,300,001 | 1,484,967,000 | 1,484,967,000 | 1,484,967,000 | 1,484,967,000 | 0 | 0 | 2020-04-30 10:00:00 | 2020-05-04 | 2020-05-18 | 01.360.270.1-008.000 | PT. NAMBUR MARLATA | 01.360.270.1-008.000 | PT. NAMBUR MARLATA | 15,033,000 | 1 % | |
3 | 2020 | DINAS KESEHATAN | Mobil Ambulance PSC 119 (DAK) | Tender Cepat | Pengadaan Barang | 2551317 | 25497739 | APBD | 750,000,000 | 729,485,000 | 729,299,999 | 729,299,999 | 729,299,999 | 729,299,999 | 0 | 0 | 2020-05-28 10:00:00 | 2020-05-29 | 2020-06-10 | 31.396.540.2-435.000 | CV. Ambulance Pintar Indonesia | 31.396.540.2-435.000 | CV. Ambulance Pintar Indonesia | 20,700,001 | 2.76 % | |
4 | 2020 | DINAS KESEHATAN | Mobil Ambulance Transport SG Pulau Tanjung (DAK) | Tender Cepat | Pengadaan Barang | 2567317 | 25497753 | APBD | 490,042,500 | 434,410,000 | 390,000,001 | 390,000,001 | 390,000,001 | 390,000,001 | 0 | 0 | 2020-06-18 11:00:00 | 2020-06-19 | 2020-06-25 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 100,042,500 | 20.42 % | |
5 | 2020 | DINAS KESEHATAN | Mobil Promosi Kesehatan (DAK) | Tender Cepat | Pengadaan Barang | 2581317 | 26009039 | APBD | 600,000,000 | 600,000,000 | 599,984,000 | 599,984,000 | 599,984,000 | 599,984,000 | 0 | 0 | 2020-07-16 10:00:00 | 2020-07-17 | 2020-07-20 | 01.960.778.7-517.000 | CV. KANA KOMPUTINDO | 01.960.778.7-517.000 | CV. KANA KOMPUTINDO | 16,000 | 0 % | |
6 | 2020 | DINAS KESEHATAN | Pengadaan Alat Kedokteran Umum | Tender Cepat | Pengadaan Barang | 2582317 | 26008986 | APBD | 11,259,150,000 | 11,226,871,500 | 11,209,896,500 | 11,209,896,500 | 11,209,896,500 | 11,209,896,500 | 0 | 0 | 2020-07-17 10:00:00 | 2020-07-20 | 2020-08-24 | 81.551.801.4-034.000 | PT. JURIAH RATU AZORA | 81.551.801.4-034.000 | PT. JURIAH RATU AZORA | 49,253,500 | 0.44 % | |
7 | 2020 | DINAS PERUMAHAN PERMUKIMAN DAN PERTANAHAN | Global Positioning System (GPS) | Tender Cepat | Pengadaan Barang | 2625317 | 26427794 | APBDP | 650,000,000 | 650,000,000 | 637,010,000 | 637,010,000 | 637,010,000 | 0 | 0 | 0 | 2020-10-26 10:00:00 | 2020-10-27 | 02.341.903.9-086.000 | PT. ASMIN ADISENTOSA | 12,990,000 | 2 % | ||||
8 | 2020 | DINAS PERIKANAN | Pengadaan Box Fiber | Tender Cepat | Pengadaan Barang | 2627317 | 26510476 | APBDP | 300,000,000 | 293,040,000 | 208,384,000 | 208,384,000 | 208,384,000 | 208,384,000 | 0 | 0 | 2020-11-03 10:00:00 | 2020-11-04 | 2020-11-23 | 86.597.393.7-808.000 | PT. Annur Rilangi Siengkang | 86.597.393.7-808.000 | PT. Annur Rilangi Siengkang | 91,616,000 | 30.54 % | |
9 | 2020 | DINAS PERIKANAN | Pengadaan Gill Net Lengkap/Rempa Kepiting | Tender Cepat | Pengadaan Barang | 2635317 | 26727222 | APBDP | 348,750,000 | 341,000,000 | 316,959,500 | 316,959,500 | 316,959,500 | 316,959,500 | 0 | 0 | 2020-11-24 15:00:00 | 2020-11-25 | 2020-11-30 | 75.964.520.3-603.000 | CV.ANGKASA JAYA TEKNIK | 75.964.520.3-603.000 | CV.ANGKASA JAYA TEKNIK | 31,790,500 | 9.12 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |