Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 78 | 148.147.156.217 | 0 | 0 | 78 | 148.147.156.217 | 0 | 0 |
Seleksi | 2 | 550.000.000 | 0 | 0 | 2 | 550.000.000 | 0 | 0 |
Tender Cepat | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 80 | 148.697.156.217 | 0 | 0 | 80 | 148.697.156.217 | 0 | 0 |
Persentase | 0 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Damar Indah - Sungai Dua Laut | Tender | Pekerjaan Konstruksi | 1994317 | 18817012 | APBD | 6,005,020,000 | 6,005,018,752 | 5,942,126,058 | 5,942,126,058 | 5,942,126,058 | 5,942,126,057 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-01-28 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 62,893,942 | 1.05 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Manggis - Karang Jawa | Tender | Pekerjaan Konstruksi | 1996317 | 18807303 | APBD | 4,802,600,000 | 4,802,599,409 | 4,530,362,781 | 4,530,362,781 | 4,530,362,781 | 4,530,362,781 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 272,237,219 | 5.67 % | |
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kawasan Industri Batulicin | Tender | Pekerjaan Konstruksi | 1997317 | 18807540 | APBD | 5,573,000,000 | 5,572,999,470 | 5,326,024,202 | 5,326,024,202 | 5,326,024,202 | 5,326,024,201 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 246,975,798 | 4.43 % | |
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Cappa Padang - Manggis Karang Jawa | Tender | Pekerjaan Konstruksi | 2006317 | 19065420 | APBD | 1,156,100,000 | 1,156,098,896 | 1,061,305,231 | 1,061,305,231 | 1,061,305,231 | 1,061,305,231 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 01.424.545.0-734.000 | CV. Asa Group | 01.424.545.0-734.000 | CV. Asa Group | 94,794,769 | 8.2 % | |
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Beringin | Tender | Pekerjaan Konstruksi | 2008317 | 18807941 | APBD | 4,518,700,000 | 4,518,700,000 | 4,280,015,129 | 4,280,015,129 | 4,277,616,584 | 4,277,616,583 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 238,684,871 | 5.28 % | |
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Makam Syarif Ali | Tender | Pekerjaan Konstruksi | 2014317 | 18816915 | APBD | 7,581,000,000 | 7,580,999,030 | 7,512,829,319 | 7,512,829,319 | 7,512,829,319 | 7,512,829,318 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-01-28 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 68,170,681 | 0.9 % | |
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Binawara - Manuntung | Tender | Pekerjaan Konstruksi | 2016317 | 18807774 | APBD | 11,926,400,000 | 11,926,399,567 | 11,798,146,215 | 11,798,146,215 | 11,798,146,215 | 11,798,146,215 | 0 | 0 | 2018-12-28 23:30:00 | 2019-01-25 | 2019-02-04 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 128,253,785 | 1.08 % | |
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Salimuran - Saring Sei. Binjai | Tender | Pekerjaan Konstruksi | 2018317 | 18816812 | APBD | 4,501,890,000 | 4,501,890,000 | 4,458,058,530 | 4,458,058,530 | 4,458,058,530 | 4,458,058,529 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-01-28 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 43,831,470 | 0.97 % | |
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawasan Peningkatan Struktur Jalan Binawara - Manuntung (DAK) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2020317 | 19135503 | APBD | 250,000,000 | 249,860,600 | 210,010,680 | 210,010,680 | 210,010,680 | 203,960,680 | 0 | 0 | 2019-02-18 16:00:00 | 2019-04-09 | 2019-04-23 | 02.883.003.2-731.000 | cv.widyadhana sultan | 02.883.003.2-731.000 | cv.widyadhana sultan | 39,989,320 | 16 % | |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Mesjid Agung Nurussalam | Tender | Pekerjaan Konstruksi | 2023317 | 19065045 | APBD | 2,499,000,000 | 2,498,999,105 | 2,470,067,575 | 2,470,067,575 | 2,446,161,000 | 2,446,161,000 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-01 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 28,932,425 | 1.16 % | |
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Pejala - Wiritasi - Gusunge | Tender | Pekerjaan Konstruksi | 2024317 | 18816694 | APBD | 2,029,000,000 | 2,029,000,000 | 2,006,680,467 | 2,006,680,467 | 1,984,850,000 | 1,984,850,000 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-01 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 22,319,533 | 1.1 % | |
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumber Wangi - Pandan Sari | Tender | Pekerjaan Konstruksi | 2025317 | 18807646 | APBD | 4,725,370,000 | 4,725,369,591 | 4,592,182,494 | 4,592,182,494 | 4,568,594,748 | 4,568,594,747 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-13 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 133,187,506 | 2.82 % | |
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumpul | Tender | Pekerjaan Konstruksi | 2039317 | 18817145 | APBD | 3,215,700,000 | 3,215,698,089 | 3,176,638,031 | 3,176,638,031 | 3,172,417,000 | 3,172,417,000 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-01 | 84.348.153.2-734.000 | PT. ZAY PUTERA PRATAMA | 84.348.153.2-734.000 | PT. ZAY PUTERA PRATAMA | 39,061,969 | 1.21 % | |
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan 4 Buah Kantor @ Rp. 3,5 M | Tender | Pekerjaan Konstruksi | 2048317 | 19047570 | APBD | 14,000,000,000 | 13,951,867,131 | 13,810,000,603 | 13,810,000,603 | 13,769,464,400 | 13,769,464,400 | 0 | 0 | 2019-04-26 23:45:00 | 2019-05-24 | 2019-06-17 | 70.534.222.8-722.000 | PT. QIRELIS MANDIRI JAYA | 70.534.222.8-722.000 | PT. QIRELIS MANDIRI JAYA | 189,999,397 | 1.36 % | |
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan RTH Kec. Mentewe | Tender | Pekerjaan Konstruksi | 2054317 | 19136068 | APBD | 1,500,000,000 | 1,500,000,000 | 1,345,955,658 | 1,345,955,658 | 1,166,262,843 | 1,166,262,843 | 0 | 0 | 2019-03-26 17:15:00 | 2019-04-15 | 2019-04-25 | 01.407.314.2-734.000 | CV ALAM | 01.407.314.2-734.000 | CV ALAM | 154,044,342 | 10.27 % | |
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Markas TNI AL | Tender | Pekerjaan Konstruksi | 2055317 | 19047107 | APBD | 999,990,000 | 998,704,437 | 778,999,000 | 778,999,000 | 778,999,000 | 778,999,000 | 0 | 0 | 2019-04-26 15:00:00 | 2019-05-15 | 2019-06-17 | 03.169.262.7-734.000 | CV.Surya Wiratama | 03.169.262.7-734.000 | CV.Surya Wiratama | 220,991,000 | 22.1 % | |
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Kersik Putih Kec. Batulicin Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2062317 | 19140791 | APBD | 2,676,530,000 | 2,676,489,449 | 2,136,724,323 | 2,136,724,323 | 2,136,724,323 | 2,136,724,322 | 0 | 0 | 2019-05-27 12:00:00 | 2019-06-28 | 2019-07-15 | 03.315.891.6-732.000 | CV.BATU PAYUNG MANDIRI | 03.315.891.6-732.000 | CV.BATU PAYUNG MANDIRI | 539,805,677 | 20.17 % | |
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Makam Guru Zakaria | Tender | Pekerjaan Konstruksi | 2085317 | 19128267 | APBD | 2,067,788,000 | 2,066,400,000 | 2,051,950,095 | 2,051,950,095 | 2,051,950,000 | 2,051,950,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 15,837,905 | 0.77 % | |
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Pandamaran Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2087317 | 19285359 | APBD | 800,000,000 | 800,000,000 | 659,841,799 | 659,841,799 | 639,104,000 | 639,104,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-04-01 | 2019-04-11 | 02.660.199.7-732.000 | CV.ARI | 02.660.199.7-732.000 | CV.ARI | 140,158,201 | 17.52 % | |
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kawasan Perkantoran Gunung Tinggi | Tender | Pekerjaan Konstruksi | 2088317 | 19284808 | APBD | 2,001,397,200 | 2,000,800,000 | 1,985,012,259 | 1,985,012,259 | 1,983,007,918 | 1,983,007,918 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 16,384,941 | 0.82 % | |
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Titian jembatan RT 02 dan 03 Batulicin | Tender | Pekerjaan Konstruksi | 2090317 | 19112675 | APBD | 580,000,000 | 579,951,000 | 546,868,910 | 546,868,910 | 536,473,000 | 536,473,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 66.142.501.7-734.000 | sewangi island | 66.142.501.7-734.000 | sewangi island | 33,131,090 | 5.71 % | |
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Desa Satui Barat - Desa Setarap | Tender | Pekerjaan Konstruksi | 2091317 | 19110417 | APBD | 1,496,715,000 | 1,493,571,860 | 1,477,598,406 | 1,477,598,406 | 1,477,598,000 | 1,477,598,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 19,116,594 | 1.28 % | |
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Satui | Tender | Pekerjaan Konstruksi | 2093317 | 19111498 | APBD | 996,752,000 | 996,200,000 | 982,046,491 | 982,046,491 | 981,884,000 | 981,884,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 14,705,509 | 1.48 % | |
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2095317 | 19284705 | APBD | 1,004,626,700 | 1,004,500,000 | 993,972,893 | 993,972,893 | 993,972,000 | 993,972,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 10,653,807 | 1.06 % | |
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Simpang Empat | Tender | Pekerjaan Konstruksi | 2096317 | 19174771 | APBD | 1,991,154,800 | 1,991,150,000 | 1,974,445,282 | 1,974,445,282 | 1,974,445,000 | 1,974,445,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 16,709,518 | 0.84 % | |
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Sungai Loban | Tender | Pekerjaan Konstruksi | 2101317 | 19120057 | APBD | 998,748,400 | 998,610,000 | 990,642,105 | 990,642,105 | 990,642,000 | 990,642,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 8,106,295 | 0.81 % | |
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Pemeliharaan Jalan | Tender | Pekerjaan Konstruksi | 2102317 | 19109745 | APBD | 896,800,000 | 896,740,000 | 889,345,854 | 889,345,854 | 889,153,000 | 889,153,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,454,146 | 0.83 % | |
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Angsana | Tender | Pekerjaan Konstruksi | 2103317 | 19113971 | APBD | 1,003,750,000 | 1,003,680,000 | 994,603,937 | 994,603,937 | 994,284,000 | 994,284,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 9,146,063 | 0.91 % | |
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Kondisi Jalan (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2110317 | 19284916 | APBD | 300,000,000 | 299,175,800 | 289,058,000 | 289,058,000 | 289,058,000 | 289,058,000 | 0 | 0 | 2019-03-27 13:00:00 | 2019-05-16 | 2019-05-31 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 10,942,000 | 3.65 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Desa Sari Utama - Desa Betung | Tender | Pekerjaan Konstruksi | 2115317 | 19119116 | APBD | 743,957,214 | 743,902,500 | 735,612,592 | 735,612,592 | 735,327,000 | 735,327,000 | 0 | 0 | 2019-04-26 10:00:00 | 2019-05-13 | 2019-05-23 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 8,344,622 | 1.12 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Karang Bintang | Tender | Pekerjaan Konstruksi | 2121317 | 19140834 | APBD | 1,000,218,042 | 1,000,040,000 | 992,324,917 | 992,324,917 | 992,324,000 | 992,324,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,893,125 | 0.79 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan di Jalan Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2123317 | 19135668 | APBD | 992,538,240 | 992,300,000 | 985,409,613 | 985,409,613 | 983,451,000 | 983,451,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 7,128,627 | 0.72 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan DPRD/Rumah Sakit Sepunggur(lanjutan) | Tender | Pekerjaan Konstruksi | 2124317 | 19122920 | APBD | 1,000,976,130 | 1,000,830,000 | 993,728,963 | 993,728,963 | 992,496,000 | 992,496,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,247,167 | 0.72 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Sumber Baru Kec. Angsana (DAK) | Tender | Pekerjaan Konstruksi | 2129317 | 19158872 | APBD | 1,750,000,000 | 1,749,999,873 | 1,406,010,205 | 1,406,010,205 | 1,404,148,000 | 1,404,148,000 | 0 | 0 | 2019-04-26 20:00:00 | 2019-05-20 | 2019-06-11 | 02.918.580.8-734.000 | cv. mitraintilestari | 02.918.580.8-734.000 | cv. mitraintilestari | 343,989,795 | 19.66 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Pondok Butun Kec. Batulicin (DAK) | Tender | Pekerjaan Konstruksi | 2131317 | 19158876 | APBD | 1,600,800,000 | 1,591,032,563 | 1,200,000,000 | 1,200,000,000 | 1,200,000,000 | 1,200,000,000 | 0 | 0 | 2019-04-26 21:00:00 | 2019-05-20 | 2019-06-14 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 400,800,000 | 25.04 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Tibarau Panjang Kec. Kusan Hulu (DAK) | Tender | Pekerjaan Konstruksi | 2133317 | 19158908 | APBD | 1,680,255,000 | 1,672,550,613 | 1,436,441,502 | 1,436,441,502 | 1,428,928,400 | 1,428,928,400 | 0 | 0 | 2019-04-29 20:00:00 | 2019-05-21 | 2019-06-12 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 243,813,498 | 14.51 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Kuranji | Tender | Pekerjaan Konstruksi | 2134317 | 19109374 | APBD | 992,538,240 | 992,365,550 | 985,796,736 | 985,796,736 | 985,621,000 | 985,621,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 6,741,504 | 0.68 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Kegiatan DAK Fisik (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2143317 | 19284893 | APBD | 250,000,000 | 249,880,400 | 234,000,800 | 234,000,800 | 234,000,800 | 217,060,800 | 0 | 0 | 2019-03-29 13:00:00 | 2019-06-11 | 2019-06-20 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 03.025.828.9-731.000 | CV. GRIYASHANTA | 15,999,200 | 6.4 % | |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Di Kecamatan Mantewe | Tender | Pekerjaan Konstruksi | 2149317 | 19139946 | APBD | 997,748,400 | 997,636,510 | 988,359,389 | 988,359,389 | 988,359,389 | 988,359,389 | 0 | 0 | 2019-04-29 20:00:00 | 2019-05-15 | 2019-05-23 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 9,389,011 | 0.94 % | |
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | AMDAL dan LARAP Bendungan kusan Kab. Tanah Bumbu | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2152317 | 19158720 | APBD | 2,982,450,000 | 2,896,725,700 | 2,720,382,500 | 2,720,382,500 | 2,720,382,500 | 2,706,743,600 | 0 | 0 | 2019-03-27 09:00:00 | 2019-05-23 | 2019-06-14 | 31.188.677.4-016.000 | PT. Arthayu Rali Perdana | 31.188.677.4-016.000 | PT. Arthayu Rali Perdana | 262,067,500 | 8.79 % | |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan rumah kaum Darul Mukminin Manurung | Tender | Pekerjaan Konstruksi | 2154317 | 21057810 | APBD | 400,000,000 | 399,994,500 | 387,400,000 | 387,400,000 | 387,375,000 | 387,375,000 | 0 | 0 | 2019-05-15 11:00:00 | 2019-05-31 | 2019-07-03 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 12,600,000 | 3.15 % | |
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Menuju TPU Desa Teluk Kepayang | Tender | Pekerjaan Konstruksi | 2159317 | 19128482 | APBD | 1,033,894,000 | 1,033,610,000 | 1,023,524,001 | 1,023,524,001 | 1,023,524,000 | 1,023,524,000 | 0 | 0 | 2019-04-26 10:00:00 | 2019-05-13 | 2019-05-23 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 10,369,999 | 1 % | |
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Kusan Hilir | Tender | Pekerjaan Konstruksi | 2169317 | 19127615 | APBD | 995,106,130 | 995,025,000 | 984,761,416 | 984,761,416 | 984,761,416 | 984,761,415 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 10,344,714 | 1.04 % | |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan kapasitas Jalan Cappa Padang | Tender | Pekerjaan Konstruksi | 2172317 | 21010928 | APBD | 2,121,900,000 | 2,121,790,000 | 2,114,035,111 | 2,114,035,111 | 2,112,801,000 | 2,112,801,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,864,889 | 0.37 % | |
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Optimalisasi jaringan Irigasi yang telah dibangun di desa Wonorejo dan Karang Mulyo | Tender | Pekerjaan Konstruksi | 2212317 | 19165086 | APBD | 485,660,000 | 485,623,398 | 388,500,000 | 388,500,000 | 388,500,000 | 388,500,000 | 0 | 0 | 2019-05-21 20:00:00 | 2019-06-14 | 2019-07-09 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 97,160,000 | 20.01 % | |
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid Agung Nurussalam Tahap II (Lanjutan) | Tender | Pekerjaan Konstruksi | 2232317 | 19135799 | APBD | 1,500,000,000 | 1,499,999,983 | 1,215,125,941 | 1,215,125,941 | 1,215,125,941 | 1,215,125,000 | 0 | 0 | 2019-07-04 18:00:00 | 2019-07-18 | 2019-08-01 | 03.261.609.6-734.000 | CV.MULIA JASA | 03.261.609.6-734.000 | CV.MULIA JASA | 284,874,059 | 18.99 % | |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Desa Binawara Kec.Kusan Hulu | Tender | Pekerjaan Konstruksi | 2276317 | 19134809 | APBD | 498,040,000 | 473,411,239 | 293,396,082 | 293,396,082 | 293,396,082 | 293,396,082 | 0 | 0 | 2019-07-02 21:00:00 | 2019-07-23 | 2019-08-23 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 204,643,918 | 41.09 % | |
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Nibung Desa Karang Indah di Angsana | Tender | Pekerjaan Konstruksi | 2277317 | 19164824 | APBD | 380,680,000 | 380,633,926 | 304,507,150 | 304,507,150 | 304,507,150 | 304,507,150 | 0 | 0 | 2019-07-02 16:00:00 | 2019-07-19 | 2019-08-16 | 72.058.970.4-731.000 | CV. SYAKAROMAH | 72.058.970.4-731.000 | CV. SYAKAROMAH | 76,172,850 | 20.01 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Daerah Anjir Baru Lasung | Tender | Pekerjaan Konstruksi | 2278317 | 21541216 | APBD | 911,683,659 | 911,508,200 | 617,419,679 | 617,419,679 | 617,419,679 | 617,419,000 | 0 | 0 | 2019-07-01 20:00:00 | 2019-07-15 | 2019-08-01 | 71.512.719.7-734.000 | CV.INTAN KIRANA BERSUJUD | 71.512.719.7-734.000 | CV.INTAN KIRANA BERSUJUD | 294,263,980 | 32.28 % | |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana Panjat Tebing Polres | Tender | Pekerjaan Konstruksi | 2289317 | 19127701 | APBD | 600,000,000 | 599,999,733 | 569,870,308 | 569,870,308 | 569,278,000 | 569,278,000 | 0 | 0 | 2019-07-31 11:00:00 | 2019-08-19 | 2019-08-27 | 03.286.705.3-733.000 | CV. FIRDAUS | 03.286.705.3-733.000 | CV. FIRDAUS | 30,129,692 | 5.02 % | |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Kecamatan 1 Buah | Tender | Pekerjaan Konstruksi | 2294317 | 19135737 | APBD | 2,000,000,000 | 1,999,734,076 | 1,777,624,941 | 1,777,624,941 | 1,777,624,941 | 1,777,624,941 | 0 | 0 | 2019-05-17 10:00:00 | 2019-06-14 | 2019-07-08 | 70.675.089.0-732.000 | CV.BORNEO RAYA | 70.675.089.0-732.000 | CV.BORNEO RAYA | 222,375,059 | 11.12 % | |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Kantor Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2296317 | 19135518 | APBD | 2,000,000,000 | 1,999,989,968 | 1,874,574,180 | 1,874,574,180 | 1,874,574,180 | 1,874,574,180 | 0 | 0 | 2019-05-17 14:00:00 | 2019-06-14 | 2019-07-08 | 66.142.501.7-734.000 | sewangi island | 66.142.501.7-734.000 | sewangi island | 125,425,820 | 6.27 % | |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Setiung Kec. Kusan Hilir (DAK) | Tender | Pekerjaan Konstruksi | 2302317 | 19163595 | APBD | 600,000,000 | 590,073,368 | 472,248,553 | 472,248,553 | 472,248,553 | 472,248,553 | 0 | 0 | 2019-05-21 18:00:00 | 2019-06-14 | 2019-07-02 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 127,751,447 | 21.29 % | |
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Sungai Danau Kec. Satui (DAK) | Tender | Pekerjaan Konstruksi | 2306317 | 19158882 | APBD | 700,000,000 | 692,552,251 | 536,688,415 | 536,688,415 | 536,688,415 | 536,688,000 | 0 | 0 | 2019-05-24 09:00:00 | 2019-06-18 | 2019-07-08 | 02.918.580.8-734.000 | cv. mitraintilestari | 02.918.580.8-734.000 | cv. mitraintilestari | 163,311,586 | 23.33 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Pandan Sari Kec. Karang Bintang Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2312317 | 19140752 | APBD | 350,000,000 | 349,999,924 | 321,461,053 | 321,461,053 | 321,461,053 | 321,461,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 02.243.109.2-734.000 | CV. Dua Saudara | 02.243.109.2-734.000 | CV. Dua Saudara | 28,538,947 | 8.15 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Sungai Cuka Kec. Satui Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2313317 | 19140331 | APBD | 250,000,000 | 249,999,158 | 211,646,564 | 211,646,564 | 211,517,000 | 211,517,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 38,353,436 | 15.34 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Beringin Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2314317 | 19140723 | APBD | 350,000,000 | 349,998,818 | 347,475,635 | 347,475,635 | 347,475,635 | 346,841,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 2,524,365 | 0.72 % | |
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Rantau Panjang Hilir Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2315317 | 19140664 | APBD | 525,000,000 | 524,999,330 | 474,335,707 | 474,335,707 | 474,335,707 | 474,335,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 50,664,293 | 9.65 % | |
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Jembatan Manggis - Insgub | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2324317 | 19119365 | APBD | 200,000,000 | 199,850,200 | 195,662,500 | 195,662,500 | 195,662,500 | 195,662,500 | 0 | 0 | 2019-06-26 18:00:00 | 2019-08-09 | 2019-09-03 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 72.116.516.5-731.000 | CV. EMPAT BELAS | 4,337,500 | 2.17 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pagar POLRES Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2326317 | 19127482 | APBD | 399,975,000 | 399,834,365 | 389,274,116 | 389,274,116 | 358,698,000 | 358,698,000 | 0 | 0 | 2019-06-19 21:00:00 | 2019-07-04 | 2019-07-18 | 80.336.960.2-733.000 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | CV.ALFARIZQI ALESHA ZHAFRAN | 10,700,884 | 2.68 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Reservior Baja SPAM IKK Mantewe | Tender | Pekerjaan Konstruksi | 2327317 | 19141186 | APBD | 808,710,000 | 808,443,348 | 799,953,000 | 799,953,000 | 790,530,678 | 799,953,000 | 0 | 0 | 2019-06-24 12:00:00 | 2019-07-09 | 2019-07-22 | 02.300.423.7-734.000 | CV. HUSKOSINDO | 02.300.423.7-734.000 | CV. HUSKOSINDO | 8,757,000 | 1.08 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Desa Danau Indah | Tender | Pekerjaan Konstruksi | 2335317 | 19284766 | APBD | 2,002,687,500 | 2,002,200,000 | 1,996,694,660 | 1,996,694,660 | 1,996,486,000 | 1,996,486,000 | 0 | 0 | 2019-07-04 15:00:00 | 2019-07-18 | 2019-07-23 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 5,992,840 | 0.3 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Goa Liang Bangkai Kec. Mantewe | Tender | Pekerjaan Konstruksi | 2336317 | 19140058 | APBD | 2,476,937,100 | 2,476,740,000 | 2,470,842,217 | 2,470,842,217 | 2,469,331,000 | 2,469,331,000 | 0 | 0 | 2019-07-04 15:00:00 | 2019-07-18 | 2019-07-23 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 6,094,883 | 0.25 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jembatan | Tender | Pekerjaan Konstruksi | 2350317 | 19110780 | APBD | 829,361,610 | 829,361,000 | 742,914,947 | 742,914,947 | 742,914,947 | 742,914,947 | 0 | 0 | 2019-07-04 22:00:00 | 2019-07-23 | 2019-08-01 | 02.243.099.5-734.000 | CV. KENARI INDAH | 02.243.099.5-734.000 | CV. KENARI INDAH | 86,446,663 | 10.42 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Maju Bersama Kec. Batulicin Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2354317 | 19140762 | APBD | 252,500,000 | 252,499,386 | 229,743,620 | 229,743,620 | 229,743,620 | 229,743,000 | 0 | 0 | 2019-07-09 10:00:00 | 2019-07-19 | 2019-07-22 | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 22,756,380 | 9.01 % | |
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Muara Pagatan Tengah Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2355317 | 19140639 | APBD | 250,000,000 | 249,999,459 | 223,682,846 | 223,682,846 | 223,682,846 | 223,682,000 | 0 | 0 | 2019-07-09 10:00:00 | 2019-07-19 | 2019-07-22 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 26,317,155 | 10.53 % | |
67 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Sepunggur Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2356317 | 19140359 | APBD | 350,000,000 | 349,999,685 | 312,576,351 | 312,576,351 | 312,576,351 | 312,576,000 | 0 | 0 | 2019-07-09 10:00:00 | 2019-07-19 | 2019-07-22 | 86.138.634.0-734.000 | suaka tirta banua | 86.138.634.0-734.000 | suaka tirta banua | 37,423,649 | 10.69 % | |
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Mangkalapi Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2360317 | 19135537 | APBD | 992,020,590 | 991,989,100 | 989,461,226 | 989,461,226 | 989,461,000 | 989,461,000 | 0 | 0 | 2019-08-01 19:00:00 | 2019-08-19 | 2019-08-22 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 2,559,364 | 0.26 % | |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Lapangan Tenis POLRES Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2366317 | 19126929 | APBD | 500,000,002 | 499,999,996 | 485,063,429 | 485,063,429 | 485,063,000 | 485,063,000 | 0 | 0 | 2019-07-31 11:00:00 | 2019-08-20 | 2019-09-02 | 82.333.270.5-733.000 | cv.ghea | 82.333.270.5-733.000 | cv.ghea | 14,936,573 | 2.99 % | |
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelita II Desa Kampung Baru Kecamatan Simpang Empat | Tender | Pekerjaan Konstruksi | 2369317 | 19174637 | APBD | 330,000,000 | 329,777,900 | 327,877,138 | 327,877,138 | 327,513,000 | 327,513,000 | 0 | 0 | 2019-07-24 12:00:00 | 2019-08-07 | 2019-08-12 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 2,122,862 | 0.64 % | |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Serba Guna (MY) | Tender | Pekerjaan Konstruksi | 2378317 | 21868766 | APBD;APBDP | 8,500,000,000 | 8,499,657,476 | 7,561,473,045 | 7,561,473,045 | 7,561,473,045 | 7,561,473,044 | 0 | 0 | 2019-09-10 18:00:00 | 2019-10-02 | 2019-10-21 | 02.043.146.6-731.000 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | CV.PUTRA LIDYS | 938,526,955 | 11.04 % | |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Kecamatan Kusan Hilir (MY) | Tender | Pekerjaan Konstruksi | 2379317 | 21864782 | APBD;APBDP | 2,000,000,000 | 1,999,989,968 | 1,750,061,940 | 1,750,061,940 | 1,750,061,940 | 1,750,061,940 | 0 | 0 | 2019-09-11 10:00:00 | 2019-10-02 | 2019-10-23 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 249,938,060 | 12.5 % | |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Akses Lokasi MTQ Desa Suka Damai Kec. Mantewe | Tender | Pekerjaan Konstruksi | 2382317 | 21872123 | APBDP | 958,110,000 | 958,110,000 | 956,615,080 | 956,615,080 | 944,756,000 | 944,756,000 | 0 | 0 | 2019-08-29 18:00:00 | 2019-09-11 | 2019-09-12 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 1,494,920 | 0.16 % | |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Manurung - Batarang - Sungai Binjai | Tender | Pekerjaan Konstruksi | 2394317 | 19127221 | APBD | 750,200,000 | 750,197,000 | 746,676,423 | 746,676,423 | 746,560,000 | 746,560,000 | 0 | 0 | 2019-09-06 09:00:00 | 2019-09-23 | 2019-10-01 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 3,523,577 | 0.47 % | |
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan jalan pusat perkantoran tahap II Kelurahan Gunung Tinggi | Tender | Pekerjaan Konstruksi | 2399317 | 22006999 | APBDP | 1,500,000,000 | 1,500,000,000 | 1,493,092,331 | 1,493,092,331 | 1,493,092,331 | 1,493,092,330 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 6,907,669 | 0.46 % | |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dusun Indra Brata Kec. Sungai Loban | Tender | Pekerjaan Konstruksi | 2401317 | 22034499 | APBDP | 743,081,130 | 743,081,130 | 737,143,629 | 737,143,629 | 737,143,000 | 737,143,000 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 5,937,501 | 0.8 % | |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan jalan Mangkalapi - Temunih | Tender | Pekerjaan Konstruksi | 2402317 | 22023264 | APBDP | 600,000,000 | 600,000,000 | 597,541,041 | 597,541,041 | 597,541,000 | 597,541,000 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 2,458,959 | 0.41 % | |
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Karang Rejo | Tender | Pekerjaan Konstruksi | 2403317 | 22011494 | APBDP | 361,120,000 | 361,120,000 | 358,510,998 | 358,510,998 | 358,510,998 | 358,510,998 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 2,609,002 | 0.72 % | |
79 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Parkir Lapangan Tembak Mapolres Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2405317 | 21901546 | APBDP | 1,100,000,000 | 1,100,000,000 | 1,065,477,961 | 1,065,477,961 | 1,037,000,000 | 1,037,000,000 | 0 | 0 | 2019-10-07 16:00:00 | 2019-10-24 | 2019-11-07 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 34,522,039 | 3.14 % | |
80 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Api-api - Muara Tengah | Tender | Pekerjaan Konstruksi | 2406317 | 19127464 | APBD | 1,000,976,130 | 1,000,976,130 | 997,469,644 | 997,469,644 | 996,909,000 | 996,909,000 | 0 | 0 | 2019-10-10 17:00:00 | 2019-10-23 | 2019-10-28 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 3,506,486 | 0.35 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Damar Indah - Sungai Dua Laut | Tender | Pekerjaan Konstruksi | 1994317 | 18817012 | APBD | 6,005,020,000 | 6,005,018,752 | 5,942,126,058 | 5,942,126,058 | 5,942,126,058 | 5,942,126,057 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-01-28 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 62,893,942 | 1.05 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Manggis - Karang Jawa | Tender | Pekerjaan Konstruksi | 1996317 | 18807303 | APBD | 4,802,600,000 | 4,802,599,409 | 4,530,362,781 | 4,530,362,781 | 4,530,362,781 | 4,530,362,781 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 272,237,219 | 5.67 % | |
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kawasan Industri Batulicin | Tender | Pekerjaan Konstruksi | 1997317 | 18807540 | APBD | 5,573,000,000 | 5,572,999,470 | 5,326,024,202 | 5,326,024,202 | 5,326,024,202 | 5,326,024,201 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 246,975,798 | 4.43 % | |
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Cappa Padang - Manggis Karang Jawa | Tender | Pekerjaan Konstruksi | 2006317 | 19065420 | APBD | 1,156,100,000 | 1,156,098,896 | 1,061,305,231 | 1,061,305,231 | 1,061,305,231 | 1,061,305,231 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 01.424.545.0-734.000 | CV. Asa Group | 01.424.545.0-734.000 | CV. Asa Group | 94,794,769 | 8.2 % | |
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Beringin | Tender | Pekerjaan Konstruksi | 2008317 | 18807941 | APBD | 4,518,700,000 | 4,518,700,000 | 4,280,015,129 | 4,280,015,129 | 4,277,616,584 | 4,277,616,583 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-02-04 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 238,684,871 | 5.28 % | |
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Makam Syarif Ali | Tender | Pekerjaan Konstruksi | 2014317 | 18816915 | APBD | 7,581,000,000 | 7,580,999,030 | 7,512,829,319 | 7,512,829,319 | 7,512,829,319 | 7,512,829,318 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-01-28 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 68,170,681 | 0.9 % | |
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Binawara - Manuntung | Tender | Pekerjaan Konstruksi | 2016317 | 18807774 | APBD | 11,926,400,000 | 11,926,399,567 | 11,798,146,215 | 11,798,146,215 | 11,798,146,215 | 11,798,146,215 | 0 | 0 | 2018-12-28 23:30:00 | 2019-01-25 | 2019-02-04 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 128,253,785 | 1.08 % | |
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Salimuran - Saring Sei. Binjai | Tender | Pekerjaan Konstruksi | 2018317 | 18816812 | APBD | 4,501,890,000 | 4,501,890,000 | 4,458,058,530 | 4,458,058,530 | 4,458,058,530 | 4,458,058,529 | 0 | 0 | 2018-12-28 23:00:00 | 2019-01-16 | 2019-01-28 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 43,831,470 | 0.97 % | |
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawasan Peningkatan Struktur Jalan Binawara - Manuntung (DAK) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2020317 | 19135503 | APBD | 250,000,000 | 249,860,600 | 210,010,680 | 210,010,680 | 210,010,680 | 203,960,680 | 0 | 0 | 2019-02-18 16:00:00 | 2019-04-09 | 2019-04-23 | 02.883.003.2-731.000 | cv.widyadhana sultan | 02.883.003.2-731.000 | cv.widyadhana sultan | 39,989,320 | 16 % | |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Mesjid Agung Nurussalam | Tender | Pekerjaan Konstruksi | 2023317 | 19065045 | APBD | 2,499,000,000 | 2,498,999,105 | 2,470,067,575 | 2,470,067,575 | 2,446,161,000 | 2,446,161,000 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-01 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 28,932,425 | 1.16 % | |
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Pejala - Wiritasi - Gusunge | Tender | Pekerjaan Konstruksi | 2024317 | 18816694 | APBD | 2,029,000,000 | 2,029,000,000 | 2,006,680,467 | 2,006,680,467 | 1,984,850,000 | 1,984,850,000 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-01 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 22,319,533 | 1.1 % | |
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumber Wangi - Pandan Sari | Tender | Pekerjaan Konstruksi | 2025317 | 18807646 | APBD | 4,725,370,000 | 4,725,369,591 | 4,592,182,494 | 4,592,182,494 | 4,568,594,748 | 4,568,594,747 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-13 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 133,187,506 | 2.82 % | |
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumpul | Tender | Pekerjaan Konstruksi | 2039317 | 18817145 | APBD | 3,215,700,000 | 3,215,698,089 | 3,176,638,031 | 3,176,638,031 | 3,172,417,000 | 3,172,417,000 | 0 | 0 | 2019-02-07 20:00:00 | 2019-02-21 | 2019-03-01 | 84.348.153.2-734.000 | PT. ZAY PUTERA PRATAMA | 84.348.153.2-734.000 | PT. ZAY PUTERA PRATAMA | 39,061,969 | 1.21 % | |
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan 4 Buah Kantor @ Rp. 3,5 M | Tender | Pekerjaan Konstruksi | 2048317 | 19047570 | APBD | 14,000,000,000 | 13,951,867,131 | 13,810,000,603 | 13,810,000,603 | 13,769,464,400 | 13,769,464,400 | 0 | 0 | 2019-04-26 23:45:00 | 2019-05-24 | 2019-06-17 | 70.534.222.8-722.000 | PT. QIRELIS MANDIRI JAYA | 70.534.222.8-722.000 | PT. QIRELIS MANDIRI JAYA | 189,999,397 | 1.36 % | |
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan RTH Kec. Mentewe | Tender | Pekerjaan Konstruksi | 2054317 | 19136068 | APBD | 1,500,000,000 | 1,500,000,000 | 1,345,955,658 | 1,345,955,658 | 1,166,262,843 | 1,166,262,843 | 0 | 0 | 2019-03-26 17:15:00 | 2019-04-15 | 2019-04-25 | 01.407.314.2-734.000 | CV ALAM | 01.407.314.2-734.000 | CV ALAM | 154,044,342 | 10.27 % | |
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Markas TNI AL | Tender | Pekerjaan Konstruksi | 2055317 | 19047107 | APBD | 999,990,000 | 998,704,437 | 778,999,000 | 778,999,000 | 778,999,000 | 778,999,000 | 0 | 0 | 2019-04-26 15:00:00 | 2019-05-15 | 2019-06-17 | 03.169.262.7-734.000 | CV.Surya Wiratama | 03.169.262.7-734.000 | CV.Surya Wiratama | 220,991,000 | 22.1 % | |
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Kersik Putih Kec. Batulicin Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2062317 | 19140791 | APBD | 2,676,530,000 | 2,676,489,449 | 2,136,724,323 | 2,136,724,323 | 2,136,724,323 | 2,136,724,322 | 0 | 0 | 2019-05-27 12:00:00 | 2019-06-28 | 2019-07-15 | 03.315.891.6-732.000 | CV.BATU PAYUNG MANDIRI | 03.315.891.6-732.000 | CV.BATU PAYUNG MANDIRI | 539,805,677 | 20.17 % | |
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Makam Guru Zakaria | Tender | Pekerjaan Konstruksi | 2085317 | 19128267 | APBD | 2,067,788,000 | 2,066,400,000 | 2,051,950,095 | 2,051,950,095 | 2,051,950,000 | 2,051,950,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 15,837,905 | 0.77 % | |
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Pandamaran Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2087317 | 19285359 | APBD | 800,000,000 | 800,000,000 | 659,841,799 | 659,841,799 | 639,104,000 | 639,104,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-04-01 | 2019-04-11 | 02.660.199.7-732.000 | CV.ARI | 02.660.199.7-732.000 | CV.ARI | 140,158,201 | 17.52 % | |
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kawasan Perkantoran Gunung Tinggi | Tender | Pekerjaan Konstruksi | 2088317 | 19284808 | APBD | 2,001,397,200 | 2,000,800,000 | 1,985,012,259 | 1,985,012,259 | 1,983,007,918 | 1,983,007,918 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 16,384,941 | 0.82 % | |
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Titian jembatan RT 02 dan 03 Batulicin | Tender | Pekerjaan Konstruksi | 2090317 | 19112675 | APBD | 580,000,000 | 579,951,000 | 546,868,910 | 546,868,910 | 536,473,000 | 536,473,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 66.142.501.7-734.000 | sewangi island | 66.142.501.7-734.000 | sewangi island | 33,131,090 | 5.71 % | |
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Desa Satui Barat - Desa Setarap | Tender | Pekerjaan Konstruksi | 2091317 | 19110417 | APBD | 1,496,715,000 | 1,493,571,860 | 1,477,598,406 | 1,477,598,406 | 1,477,598,000 | 1,477,598,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 19,116,594 | 1.28 % | |
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Satui | Tender | Pekerjaan Konstruksi | 2093317 | 19111498 | APBD | 996,752,000 | 996,200,000 | 982,046,491 | 982,046,491 | 981,884,000 | 981,884,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 14,705,509 | 1.48 % | |
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2095317 | 19284705 | APBD | 1,004,626,700 | 1,004,500,000 | 993,972,893 | 993,972,893 | 993,972,000 | 993,972,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 10,653,807 | 1.06 % | |
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Simpang Empat | Tender | Pekerjaan Konstruksi | 2096317 | 19174771 | APBD | 1,991,154,800 | 1,991,150,000 | 1,974,445,282 | 1,974,445,282 | 1,974,445,000 | 1,974,445,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 16,709,518 | 0.84 % | |
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Sungai Loban | Tender | Pekerjaan Konstruksi | 2101317 | 19120057 | APBD | 998,748,400 | 998,610,000 | 990,642,105 | 990,642,105 | 990,642,000 | 990,642,000 | 0 | 0 | 2019-03-13 18:00:00 | 2019-03-28 | 2019-04-09 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 8,106,295 | 0.81 % | |
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Pemeliharaan Jalan | Tender | Pekerjaan Konstruksi | 2102317 | 19109745 | APBD | 896,800,000 | 896,740,000 | 889,345,854 | 889,345,854 | 889,153,000 | 889,153,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,454,146 | 0.83 % | |
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Angsana | Tender | Pekerjaan Konstruksi | 2103317 | 19113971 | APBD | 1,003,750,000 | 1,003,680,000 | 994,603,937 | 994,603,937 | 994,284,000 | 994,284,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 9,146,063 | 0.91 % | |
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Desa Sari Utama - Desa Betung | Tender | Pekerjaan Konstruksi | 2115317 | 19119116 | APBD | 743,957,214 | 743,902,500 | 735,612,592 | 735,612,592 | 735,327,000 | 735,327,000 | 0 | 0 | 2019-04-26 10:00:00 | 2019-05-13 | 2019-05-23 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 8,344,622 | 1.12 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Karang Bintang | Tender | Pekerjaan Konstruksi | 2121317 | 19140834 | APBD | 1,000,218,042 | 1,000,040,000 | 992,324,917 | 992,324,917 | 992,324,000 | 992,324,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,893,125 | 0.79 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan di Jalan Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2123317 | 19135668 | APBD | 992,538,240 | 992,300,000 | 985,409,613 | 985,409,613 | 983,451,000 | 983,451,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 7,128,627 | 0.72 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan DPRD/Rumah Sakit Sepunggur(lanjutan) | Tender | Pekerjaan Konstruksi | 2124317 | 19122920 | APBD | 1,000,976,130 | 1,000,830,000 | 993,728,963 | 993,728,963 | 992,496,000 | 992,496,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,247,167 | 0.72 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Sumber Baru Kec. Angsana (DAK) | Tender | Pekerjaan Konstruksi | 2129317 | 19158872 | APBD | 1,750,000,000 | 1,749,999,873 | 1,406,010,205 | 1,406,010,205 | 1,404,148,000 | 1,404,148,000 | 0 | 0 | 2019-04-26 20:00:00 | 2019-05-20 | 2019-06-11 | 02.918.580.8-734.000 | cv. mitraintilestari | 02.918.580.8-734.000 | cv. mitraintilestari | 343,989,795 | 19.66 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Pondok Butun Kec. Batulicin (DAK) | Tender | Pekerjaan Konstruksi | 2131317 | 19158876 | APBD | 1,600,800,000 | 1,591,032,563 | 1,200,000,000 | 1,200,000,000 | 1,200,000,000 | 1,200,000,000 | 0 | 0 | 2019-04-26 21:00:00 | 2019-05-20 | 2019-06-14 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 400,800,000 | 25.04 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Tibarau Panjang Kec. Kusan Hulu (DAK) | Tender | Pekerjaan Konstruksi | 2133317 | 19158908 | APBD | 1,680,255,000 | 1,672,550,613 | 1,436,441,502 | 1,436,441,502 | 1,428,928,400 | 1,428,928,400 | 0 | 0 | 2019-04-29 20:00:00 | 2019-05-21 | 2019-06-12 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 243,813,498 | 14.51 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Kuranji | Tender | Pekerjaan Konstruksi | 2134317 | 19109374 | APBD | 992,538,240 | 992,365,550 | 985,796,736 | 985,796,736 | 985,621,000 | 985,621,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 6,741,504 | 0.68 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Di Kecamatan Mantewe | Tender | Pekerjaan Konstruksi | 2149317 | 19139946 | APBD | 997,748,400 | 997,636,510 | 988,359,389 | 988,359,389 | 988,359,389 | 988,359,389 | 0 | 0 | 2019-04-29 20:00:00 | 2019-05-15 | 2019-05-23 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 9,389,011 | 0.94 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | AMDAL dan LARAP Bendungan kusan Kab. Tanah Bumbu | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2152317 | 19158720 | APBD | 2,982,450,000 | 2,896,725,700 | 2,720,382,500 | 2,720,382,500 | 2,720,382,500 | 2,706,743,600 | 0 | 0 | 2019-03-27 09:00:00 | 2019-05-23 | 2019-06-14 | 31.188.677.4-016.000 | PT. Arthayu Rali Perdana | 31.188.677.4-016.000 | PT. Arthayu Rali Perdana | 262,067,500 | 8.79 % | |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan rumah kaum Darul Mukminin Manurung | Tender | Pekerjaan Konstruksi | 2154317 | 21057810 | APBD | 400,000,000 | 399,994,500 | 387,400,000 | 387,400,000 | 387,375,000 | 387,375,000 | 0 | 0 | 2019-05-15 11:00:00 | 2019-05-31 | 2019-07-03 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 12,600,000 | 3.15 % | |
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Menuju TPU Desa Teluk Kepayang | Tender | Pekerjaan Konstruksi | 2159317 | 19128482 | APBD | 1,033,894,000 | 1,033,610,000 | 1,023,524,001 | 1,023,524,001 | 1,023,524,000 | 1,023,524,000 | 0 | 0 | 2019-04-26 10:00:00 | 2019-05-13 | 2019-05-23 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 10,369,999 | 1 % | |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Kusan Hilir | Tender | Pekerjaan Konstruksi | 2169317 | 19127615 | APBD | 995,106,130 | 995,025,000 | 984,761,416 | 984,761,416 | 984,761,416 | 984,761,415 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 10,344,714 | 1.04 % | |
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan kapasitas Jalan Cappa Padang | Tender | Pekerjaan Konstruksi | 2172317 | 21010928 | APBD | 2,121,900,000 | 2,121,790,000 | 2,114,035,111 | 2,114,035,111 | 2,112,801,000 | 2,112,801,000 | 0 | 0 | 2019-03-29 20:00:00 | 2019-04-16 | 2019-04-26 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,864,889 | 0.37 % | |
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Optimalisasi jaringan Irigasi yang telah dibangun di desa Wonorejo dan Karang Mulyo | Tender | Pekerjaan Konstruksi | 2212317 | 19165086 | APBD | 485,660,000 | 485,623,398 | 388,500,000 | 388,500,000 | 388,500,000 | 388,500,000 | 0 | 0 | 2019-05-21 20:00:00 | 2019-06-14 | 2019-07-09 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 97,160,000 | 20.01 % | |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid Agung Nurussalam Tahap II (Lanjutan) | Tender | Pekerjaan Konstruksi | 2232317 | 19135799 | APBD | 1,500,000,000 | 1,499,999,983 | 1,215,125,941 | 1,215,125,941 | 1,215,125,941 | 1,215,125,000 | 0 | 0 | 2019-07-04 18:00:00 | 2019-07-18 | 2019-08-01 | 03.261.609.6-734.000 | CV.MULIA JASA | 03.261.609.6-734.000 | CV.MULIA JASA | 284,874,059 | 18.99 % | |
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Desa Binawara Kec.Kusan Hulu | Tender | Pekerjaan Konstruksi | 2276317 | 19134809 | APBD | 498,040,000 | 473,411,239 | 293,396,082 | 293,396,082 | 293,396,082 | 293,396,082 | 0 | 0 | 2019-07-02 21:00:00 | 2019-07-23 | 2019-08-23 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 204,643,918 | 41.09 % | |
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Nibung Desa Karang Indah di Angsana | Tender | Pekerjaan Konstruksi | 2277317 | 19164824 | APBD | 380,680,000 | 380,633,926 | 304,507,150 | 304,507,150 | 304,507,150 | 304,507,150 | 0 | 0 | 2019-07-02 16:00:00 | 2019-07-19 | 2019-08-16 | 72.058.970.4-731.000 | CV. SYAKAROMAH | 72.058.970.4-731.000 | CV. SYAKAROMAH | 76,172,850 | 20.01 % | |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Daerah Anjir Baru Lasung | Tender | Pekerjaan Konstruksi | 2278317 | 21541216 | APBD | 911,683,659 | 911,508,200 | 617,419,679 | 617,419,679 | 617,419,679 | 617,419,000 | 0 | 0 | 2019-07-01 20:00:00 | 2019-07-15 | 2019-08-01 | 71.512.719.7-734.000 | CV.INTAN KIRANA BERSUJUD | 71.512.719.7-734.000 | CV.INTAN KIRANA BERSUJUD | 294,263,980 | 32.28 % | |
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana Panjat Tebing Polres | Tender | Pekerjaan Konstruksi | 2289317 | 19127701 | APBD | 600,000,000 | 599,999,733 | 569,870,308 | 569,870,308 | 569,278,000 | 569,278,000 | 0 | 0 | 2019-07-31 11:00:00 | 2019-08-19 | 2019-08-27 | 03.286.705.3-733.000 | CV. FIRDAUS | 03.286.705.3-733.000 | CV. FIRDAUS | 30,129,692 | 5.02 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Kecamatan 1 Buah | Tender | Pekerjaan Konstruksi | 2294317 | 19135737 | APBD | 2,000,000,000 | 1,999,734,076 | 1,777,624,941 | 1,777,624,941 | 1,777,624,941 | 1,777,624,941 | 0 | 0 | 2019-05-17 10:00:00 | 2019-06-14 | 2019-07-08 | 70.675.089.0-732.000 | CV.BORNEO RAYA | 70.675.089.0-732.000 | CV.BORNEO RAYA | 222,375,059 | 11.12 % | |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Kantor Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2296317 | 19135518 | APBD | 2,000,000,000 | 1,999,989,968 | 1,874,574,180 | 1,874,574,180 | 1,874,574,180 | 1,874,574,180 | 0 | 0 | 2019-05-17 14:00:00 | 2019-06-14 | 2019-07-08 | 66.142.501.7-734.000 | sewangi island | 66.142.501.7-734.000 | sewangi island | 125,425,820 | 6.27 % | |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Setiung Kec. Kusan Hilir (DAK) | Tender | Pekerjaan Konstruksi | 2302317 | 19163595 | APBD | 600,000,000 | 590,073,368 | 472,248,553 | 472,248,553 | 472,248,553 | 472,248,553 | 0 | 0 | 2019-05-21 18:00:00 | 2019-06-14 | 2019-07-02 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 127,751,447 | 21.29 % | |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Sungai Danau Kec. Satui (DAK) | Tender | Pekerjaan Konstruksi | 2306317 | 19158882 | APBD | 700,000,000 | 692,552,251 | 536,688,415 | 536,688,415 | 536,688,415 | 536,688,000 | 0 | 0 | 2019-05-24 09:00:00 | 2019-06-18 | 2019-07-08 | 02.918.580.8-734.000 | cv. mitraintilestari | 02.918.580.8-734.000 | cv. mitraintilestari | 163,311,586 | 23.33 % | |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Pandan Sari Kec. Karang Bintang Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2312317 | 19140752 | APBD | 350,000,000 | 349,999,924 | 321,461,053 | 321,461,053 | 321,461,053 | 321,461,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 02.243.109.2-734.000 | CV. Dua Saudara | 02.243.109.2-734.000 | CV. Dua Saudara | 28,538,947 | 8.15 % | |
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Sungai Cuka Kec. Satui Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2313317 | 19140331 | APBD | 250,000,000 | 249,999,158 | 211,646,564 | 211,646,564 | 211,517,000 | 211,517,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 38,353,436 | 15.34 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Beringin Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2314317 | 19140723 | APBD | 350,000,000 | 349,998,818 | 347,475,635 | 347,475,635 | 347,475,635 | 346,841,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 2,524,365 | 0.72 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Rantau Panjang Hilir Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2315317 | 19140664 | APBD | 525,000,000 | 524,999,330 | 474,335,707 | 474,335,707 | 474,335,707 | 474,335,000 | 0 | 0 | 2019-06-24 19:00:00 | 2019-07-08 | 2019-07-17 | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 50,664,293 | 9.65 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Jembatan Manggis - Insgub | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2324317 | 19119365 | APBD | 200,000,000 | 199,850,200 | 195,662,500 | 195,662,500 | 195,662,500 | 195,662,500 | 0 | 0 | 2019-06-26 18:00:00 | 2019-08-09 | 2019-09-03 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 72.116.516.5-731.000 | CV. EMPAT BELAS | 4,337,500 | 2.17 % | |
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pagar POLRES Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2326317 | 19127482 | APBD | 399,975,000 | 399,834,365 | 389,274,116 | 389,274,116 | 358,698,000 | 358,698,000 | 0 | 0 | 2019-06-19 21:00:00 | 2019-07-04 | 2019-07-18 | 80.336.960.2-733.000 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | CV.ALFARIZQI ALESHA ZHAFRAN | 10,700,884 | 2.68 % | |
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Reservior Baja SPAM IKK Mantewe | Tender | Pekerjaan Konstruksi | 2327317 | 19141186 | APBD | 808,710,000 | 808,443,348 | 799,953,000 | 799,953,000 | 790,530,678 | 799,953,000 | 0 | 0 | 2019-06-24 12:00:00 | 2019-07-09 | 2019-07-22 | 02.300.423.7-734.000 | CV. HUSKOSINDO | 02.300.423.7-734.000 | CV. HUSKOSINDO | 8,757,000 | 1.08 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Desa Danau Indah | Tender | Pekerjaan Konstruksi | 2335317 | 19284766 | APBD | 2,002,687,500 | 2,002,200,000 | 1,996,694,660 | 1,996,694,660 | 1,996,486,000 | 1,996,486,000 | 0 | 0 | 2019-07-04 15:00:00 | 2019-07-18 | 2019-07-23 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 5,992,840 | 0.3 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Goa Liang Bangkai Kec. Mantewe | Tender | Pekerjaan Konstruksi | 2336317 | 19140058 | APBD | 2,476,937,100 | 2,476,740,000 | 2,470,842,217 | 2,470,842,217 | 2,469,331,000 | 2,469,331,000 | 0 | 0 | 2019-07-04 15:00:00 | 2019-07-18 | 2019-07-23 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 6,094,883 | 0.25 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jembatan | Tender | Pekerjaan Konstruksi | 2350317 | 19110780 | APBD | 829,361,610 | 829,361,000 | 742,914,947 | 742,914,947 | 742,914,947 | 742,914,947 | 0 | 0 | 2019-07-04 22:00:00 | 2019-07-23 | 2019-08-01 | 02.243.099.5-734.000 | CV. KENARI INDAH | 02.243.099.5-734.000 | CV. KENARI INDAH | 86,446,663 | 10.42 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Maju Bersama Kec. Batulicin Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2354317 | 19140762 | APBD | 252,500,000 | 252,499,386 | 229,743,620 | 229,743,620 | 229,743,620 | 229,743,000 | 0 | 0 | 2019-07-09 10:00:00 | 2019-07-19 | 2019-07-22 | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 22,756,380 | 9.01 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Muara Pagatan Tengah Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2355317 | 19140639 | APBD | 250,000,000 | 249,999,459 | 223,682,846 | 223,682,846 | 223,682,846 | 223,682,000 | 0 | 0 | 2019-07-09 10:00:00 | 2019-07-19 | 2019-07-22 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 26,317,155 | 10.53 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Sepunggur Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2356317 | 19140359 | APBD | 350,000,000 | 349,999,685 | 312,576,351 | 312,576,351 | 312,576,351 | 312,576,000 | 0 | 0 | 2019-07-09 10:00:00 | 2019-07-19 | 2019-07-22 | 86.138.634.0-734.000 | suaka tirta banua | 86.138.634.0-734.000 | suaka tirta banua | 37,423,649 | 10.69 % | |
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Mangkalapi Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2360317 | 19135537 | APBD | 992,020,590 | 991,989,100 | 989,461,226 | 989,461,226 | 989,461,000 | 989,461,000 | 0 | 0 | 2019-08-01 19:00:00 | 2019-08-19 | 2019-08-22 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 2,559,364 | 0.26 % | |
67 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Lapangan Tenis POLRES Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2366317 | 19126929 | APBD | 500,000,002 | 499,999,996 | 485,063,429 | 485,063,429 | 485,063,000 | 485,063,000 | 0 | 0 | 2019-07-31 11:00:00 | 2019-08-20 | 2019-09-02 | 82.333.270.5-733.000 | cv.ghea | 82.333.270.5-733.000 | cv.ghea | 14,936,573 | 2.99 % | |
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelita II Desa Kampung Baru Kecamatan Simpang Empat | Tender | Pekerjaan Konstruksi | 2369317 | 19174637 | APBD | 330,000,000 | 329,777,900 | 327,877,138 | 327,877,138 | 327,513,000 | 327,513,000 | 0 | 0 | 2019-07-24 12:00:00 | 2019-08-07 | 2019-08-12 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 2,122,862 | 0.64 % | |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Serba Guna (MY) | Tender | Pekerjaan Konstruksi | 2378317 | 21868766 | APBD;APBDP | 8,500,000,000 | 8,499,657,476 | 7,561,473,045 | 7,561,473,045 | 7,561,473,045 | 7,561,473,044 | 0 | 0 | 2019-09-10 18:00:00 | 2019-10-02 | 2019-10-21 | 02.043.146.6-731.000 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | CV.PUTRA LIDYS | 938,526,955 | 11.04 % | |
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Kecamatan Kusan Hilir (MY) | Tender | Pekerjaan Konstruksi | 2379317 | 21864782 | APBD;APBDP | 2,000,000,000 | 1,999,989,968 | 1,750,061,940 | 1,750,061,940 | 1,750,061,940 | 1,750,061,940 | 0 | 0 | 2019-09-11 10:00:00 | 2019-10-02 | 2019-10-23 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 249,938,060 | 12.5 % | |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Akses Lokasi MTQ Desa Suka Damai Kec. Mantewe | Tender | Pekerjaan Konstruksi | 2382317 | 21872123 | APBDP | 958,110,000 | 958,110,000 | 956,615,080 | 956,615,080 | 944,756,000 | 944,756,000 | 0 | 0 | 2019-08-29 18:00:00 | 2019-09-11 | 2019-09-12 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 1,494,920 | 0.16 % | |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Manurung - Batarang - Sungai Binjai | Tender | Pekerjaan Konstruksi | 2394317 | 19127221 | APBD | 750,200,000 | 750,197,000 | 746,676,423 | 746,676,423 | 746,560,000 | 746,560,000 | 0 | 0 | 2019-09-06 09:00:00 | 2019-09-23 | 2019-10-01 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 3,523,577 | 0.47 % | |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan jalan pusat perkantoran tahap II Kelurahan Gunung Tinggi | Tender | Pekerjaan Konstruksi | 2399317 | 22006999 | APBDP | 1,500,000,000 | 1,500,000,000 | 1,493,092,331 | 1,493,092,331 | 1,493,092,331 | 1,493,092,330 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 6,907,669 | 0.46 % | |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dusun Indra Brata Kec. Sungai Loban | Tender | Pekerjaan Konstruksi | 2401317 | 22034499 | APBDP | 743,081,130 | 743,081,130 | 737,143,629 | 737,143,629 | 737,143,000 | 737,143,000 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 5,937,501 | 0.8 % | |
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan jalan Mangkalapi - Temunih | Tender | Pekerjaan Konstruksi | 2402317 | 22023264 | APBDP | 600,000,000 | 600,000,000 | 597,541,041 | 597,541,041 | 597,541,000 | 597,541,000 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 2,458,959 | 0.41 % | |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Karang Rejo | Tender | Pekerjaan Konstruksi | 2403317 | 22011494 | APBDP | 361,120,000 | 361,120,000 | 358,510,998 | 358,510,998 | 358,510,998 | 358,510,998 | 0 | 0 | 2019-10-08 18:00:00 | 2019-10-21 | 2019-10-24 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 2,609,002 | 0.72 % | |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Parkir Lapangan Tembak Mapolres Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2405317 | 21901546 | APBDP | 1,100,000,000 | 1,100,000,000 | 1,065,477,961 | 1,065,477,961 | 1,037,000,000 | 1,037,000,000 | 0 | 0 | 2019-10-07 16:00:00 | 2019-10-24 | 2019-11-07 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 34,522,039 | 3.14 % | |
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Api-api - Muara Tengah | Tender | Pekerjaan Konstruksi | 2406317 | 19127464 | APBD | 1,000,976,130 | 1,000,976,130 | 997,469,644 | 997,469,644 | 996,909,000 | 996,909,000 | 0 | 0 | 2019-10-10 17:00:00 | 2019-10-23 | 2019-10-28 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 3,506,486 | 0.35 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Kondisi Jalan (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2110317 | 19284916 | APBD | 300,000,000 | 299,175,800 | 289,058,000 | 289,058,000 | 289,058,000 | 289,058,000 | 0 | 0 | 2019-03-27 13:00:00 | 2019-05-16 | 2019-05-31 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 10,942,000 | 3.65 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Kegiatan DAK Fisik (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2143317 | 19284893 | APBD | 250,000,000 | 249,880,400 | 234,000,800 | 234,000,800 | 234,000,800 | 217,060,800 | 0 | 0 | 2019-03-29 13:00:00 | 2019-06-11 | 2019-06-20 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 03.025.828.9-731.000 | CV. GRIYASHANTA | 15,999,200 | 6.4 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Damar Indah - Sungai Dua Laut | Tender | Pekerjaan Konstruksi | 1994317 | 18817012 | 6,005,020,000 | 6,005,018,752 | 5,942,126,058 | 5,942,126,057 | 0 | 0 | 2018-12-28 23:00:00 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 62,893,942 | 1.05 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Manggis - Karang Jawa | Tender | Pekerjaan Konstruksi | 1996317 | 18807303 | 4,802,600,000 | 4,802,599,409 | 4,530,362,781 | 4,530,362,781 | 0 | 0 | 2018-12-28 23:00:00 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 272,237,219 | 5.67 % | |
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kawasan Industri Batulicin | Tender | Pekerjaan Konstruksi | 1997317 | 18807540 | 5,573,000,000 | 5,572,999,470 | 5,326,024,202 | 5,326,024,201 | 0 | 0 | 2018-12-28 23:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 246,975,798 | 4.43 % | |
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Cappa Padang - Manggis Karang Jawa | Tender | Pekerjaan Konstruksi | 2006317 | 19065420 | 1,156,100,000 | 1,156,098,896 | 1,061,305,231 | 1,061,305,231 | 0 | 0 | 2018-12-28 23:00:00 | 01.424.545.0-734.000 | CV. Asa Group | 01.424.545.0-734.000 | CV. Asa Group | 94,794,769 | 8.2 % | |
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Beringin | Tender | Pekerjaan Konstruksi | 2008317 | 18807941 | 4,518,700,000 | 4,518,700,000 | 4,280,015,129 | 4,277,616,583 | 0 | 0 | 2018-12-28 23:00:00 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 238,684,871 | 5.28 % | |
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Makam Syarif Ali | Tender | Pekerjaan Konstruksi | 2014317 | 18816915 | 7,581,000,000 | 7,580,999,030 | 7,512,829,319 | 7,512,829,318 | 0 | 0 | 2018-12-28 23:00:00 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 68,170,681 | 0.9 % | |
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Binawara - Manuntung | Tender | Pekerjaan Konstruksi | 2016317 | 18807774 | 11,926,400,000 | 11,926,399,567 | 11,798,146,215 | 11,798,146,215 | 0 | 0 | 2018-12-28 23:30:00 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 128,253,785 | 1.08 % | |
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Salimuran - Saring Sei. Binjai | Tender | Pekerjaan Konstruksi | 2018317 | 18816812 | 4,501,890,000 | 4,501,890,000 | 4,458,058,530 | 4,458,058,529 | 0 | 0 | 2018-12-28 23:00:00 | 03.169.314.6-734.000 | BKW READY MIX | 03.169.314.6-734.000 | BKW READY MIX | 43,831,470 | 0.97 % | |
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawasan Peningkatan Struktur Jalan Binawara - Manuntung (DAK) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2020317 | 19135503 | 250,000,000 | 249,860,600 | 210,010,680 | 203,960,680 | 0 | 0 | 2019-02-18 16:00:00 | 02.883.003.2-731.000 | cv.widyadhana sultan | 02.883.003.2-731.000 | cv.widyadhana sultan | 39,989,320 | 16 % | |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Mesjid Agung Nurussalam | Tender | Pekerjaan Konstruksi | 2023317 | 19065045 | 2,499,000,000 | 2,498,999,105 | 2,470,067,575 | 2,446,161,000 | 0 | 0 | 2019-02-07 20:00:00 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 28,932,425 | 1.16 % | |
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Pejala - Wiritasi - Gusunge | Tender | Pekerjaan Konstruksi | 2024317 | 18816694 | 2,029,000,000 | 2,029,000,000 | 2,006,680,467 | 1,984,850,000 | 0 | 0 | 2019-02-07 20:00:00 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 22,319,533 | 1.1 % | |
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumber Wangi - Pandan Sari | Tender | Pekerjaan Konstruksi | 2025317 | 18807646 | 4,725,370,000 | 4,725,369,591 | 4,592,182,494 | 4,568,594,747 | 0 | 0 | 2019-02-07 20:00:00 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 133,187,506 | 2.82 % | |
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Sumpul | Tender | Pekerjaan Konstruksi | 2039317 | 18817145 | 3,215,700,000 | 3,215,698,089 | 3,176,638,031 | 3,172,417,000 | 0 | 0 | 2019-02-07 20:00:00 | 84.348.153.2-734.000 | PT. ZAY PUTERA PRATAMA | 84.348.153.2-734.000 | PT. ZAY PUTERA PRATAMA | 39,061,969 | 1.21 % | |
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan 4 Buah Kantor @ Rp. 3,5 M | Tender | Pekerjaan Konstruksi | 2048317 | 19047570 | 14,000,000,000 | 13,951,867,131 | 13,810,000,603 | 13,769,464,400 | 0 | 0 | 2019-04-26 23:45:00 | 70.534.222.8-722.000 | PT. QIRELIS MANDIRI JAYA | 70.534.222.8-722.000 | PT. QIRELIS MANDIRI JAYA | 189,999,397 | 1.36 % | |
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan RTH Kec. Mentewe | Tender | Pekerjaan Konstruksi | 2054317 | 19136068 | 1,500,000,000 | 1,500,000,000 | 1,345,955,658 | 1,166,262,843 | 0 | 0 | 2019-03-26 17:15:00 | 01.407.314.2-734.000 | CV ALAM | 01.407.314.2-734.000 | CV ALAM | 154,044,342 | 10.27 % | |
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Markas TNI AL | Tender | Pekerjaan Konstruksi | 2055317 | 19047107 | 999,990,000 | 998,704,437 | 778,999,000 | 778,999,000 | 0 | 0 | 2019-04-26 15:00:00 | 03.169.262.7-734.000 | CV.Surya Wiratama | 03.169.262.7-734.000 | CV.Surya Wiratama | 220,991,000 | 22.1 % | |
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM BNA Batulicin untuk Desa Kersik Putih Kec. Batulicin Kab. Tanah Bumbu (DAK) Reguler | Tender | Pekerjaan Konstruksi | 2062317 | 19140791 | 2,676,530,000 | 2,676,489,449 | 2,136,724,323 | 2,136,724,322 | 0 | 0 | 2019-05-27 12:00:00 | 03.315.891.6-732.000 | CV.BATU PAYUNG MANDIRI | 03.315.891.6-732.000 | CV.BATU PAYUNG MANDIRI | 539,805,677 | 20.17 % | |
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Makam Guru Zakaria | Tender | Pekerjaan Konstruksi | 2085317 | 19128267 | 2,067,788,000 | 2,066,400,000 | 2,051,950,095 | 2,051,950,000 | 0 | 0 | 2019-03-13 18:00:00 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 15,837,905 | 0.77 % | |
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Pandamaran Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2087317 | 19285359 | 800,000,000 | 800,000,000 | 659,841,799 | 639,104,000 | 0 | 0 | 2019-03-13 18:00:00 | 02.660.199.7-732.000 | CV.ARI | 02.660.199.7-732.000 | CV.ARI | 140,158,201 | 17.52 % | |
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kawasan Perkantoran Gunung Tinggi | Tender | Pekerjaan Konstruksi | 2088317 | 19284808 | 2,001,397,200 | 2,000,800,000 | 1,985,012,259 | 1,983,007,918 | 0 | 0 | 2019-03-13 18:00:00 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 16,384,941 | 0.82 % | |
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Titian jembatan RT 02 dan 03 Batulicin | Tender | Pekerjaan Konstruksi | 2090317 | 19112675 | 580,000,000 | 579,951,000 | 546,868,910 | 536,473,000 | 0 | 0 | 2019-03-13 18:00:00 | 66.142.501.7-734.000 | sewangi island | 66.142.501.7-734.000 | sewangi island | 33,131,090 | 5.71 % | |
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Desa Satui Barat - Desa Setarap | Tender | Pekerjaan Konstruksi | 2091317 | 19110417 | 1,496,715,000 | 1,493,571,860 | 1,477,598,406 | 1,477,598,000 | 0 | 0 | 2019-03-13 18:00:00 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 19,116,594 | 1.28 % | |
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Satui | Tender | Pekerjaan Konstruksi | 2093317 | 19111498 | 996,752,000 | 996,200,000 | 982,046,491 | 981,884,000 | 0 | 0 | 2019-03-13 18:00:00 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 14,705,509 | 1.48 % | |
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Batulicin | Tender | Pekerjaan Konstruksi | 2095317 | 19284705 | 1,004,626,700 | 1,004,500,000 | 993,972,893 | 993,972,000 | 0 | 0 | 2019-03-13 18:00:00 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 10,653,807 | 1.06 % | |
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Simpang Empat | Tender | Pekerjaan Konstruksi | 2096317 | 19174771 | 1,991,154,800 | 1,991,150,000 | 1,974,445,282 | 1,974,445,000 | 0 | 0 | 2019-03-13 18:00:00 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 16,709,518 | 0.84 % | |
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Sungai Loban | Tender | Pekerjaan Konstruksi | 2101317 | 19120057 | 998,748,400 | 998,610,000 | 990,642,105 | 990,642,000 | 0 | 0 | 2019-03-13 18:00:00 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 8,106,295 | 0.81 % | |
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Pemeliharaan Jalan | Tender | Pekerjaan Konstruksi | 2102317 | 19109745 | 896,800,000 | 896,740,000 | 889,345,854 | 889,153,000 | 0 | 0 | 2019-03-29 20:00:00 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,454,146 | 0.83 % | |
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Angsana | Tender | Pekerjaan Konstruksi | 2103317 | 19113971 | 1,003,750,000 | 1,003,680,000 | 994,603,937 | 994,284,000 | 0 | 0 | 2019-03-29 20:00:00 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 9,146,063 | 0.91 % | |
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Kondisi Jalan (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2110317 | 19284916 | 300,000,000 | 299,175,800 | 289,058,000 | 289,058,000 | 0 | 0 | 2019-03-27 13:00:00 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 10,942,000 | 3.65 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Desa Sari Utama - Desa Betung | Tender | Pekerjaan Konstruksi | 2115317 | 19119116 | 743,957,214 | 743,902,500 | 735,612,592 | 735,327,000 | 0 | 0 | 2019-04-26 10:00:00 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 8,344,622 | 1.12 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Karang Bintang | Tender | Pekerjaan Konstruksi | 2121317 | 19140834 | 1,000,218,042 | 1,000,040,000 | 992,324,917 | 992,324,000 | 0 | 0 | 2019-03-29 20:00:00 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,893,125 | 0.79 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan di Jalan Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2123317 | 19135668 | 992,538,240 | 992,300,000 | 985,409,613 | 983,451,000 | 0 | 0 | 2019-03-29 20:00:00 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 7,128,627 | 0.72 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan DPRD/Rumah Sakit Sepunggur(lanjutan) | Tender | Pekerjaan Konstruksi | 2124317 | 19122920 | 1,000,976,130 | 1,000,830,000 | 993,728,963 | 992,496,000 | 0 | 0 | 2019-03-29 20:00:00 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,247,167 | 0.72 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Sumber Baru Kec. Angsana (DAK) | Tender | Pekerjaan Konstruksi | 2129317 | 19158872 | 1,750,000,000 | 1,749,999,873 | 1,406,010,205 | 1,404,148,000 | 0 | 0 | 2019-04-26 20:00:00 | 02.918.580.8-734.000 | cv. mitraintilestari | 02.918.580.8-734.000 | cv. mitraintilestari | 343,989,795 | 19.66 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Pondok Butun Kec. Batulicin (DAK) | Tender | Pekerjaan Konstruksi | 2131317 | 19158876 | 1,600,800,000 | 1,591,032,563 | 1,200,000,000 | 1,200,000,000 | 0 | 0 | 2019-04-26 21:00:00 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 400,800,000 | 25.04 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Tibarau Panjang Kec. Kusan Hulu (DAK) | Tender | Pekerjaan Konstruksi | 2133317 | 19158908 | 1,680,255,000 | 1,672,550,613 | 1,436,441,502 | 1,428,928,400 | 0 | 0 | 2019-04-29 20:00:00 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 243,813,498 | 14.51 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Kuranji | Tender | Pekerjaan Konstruksi | 2134317 | 19109374 | 992,538,240 | 992,365,550 | 985,796,736 | 985,621,000 | 0 | 0 | 2019-03-29 20:00:00 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 6,741,504 | 0.68 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Kegiatan DAK Fisik (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2143317 | 19284893 | 250,000,000 | 249,880,400 | 234,000,800 | 217,060,800 | 0 | 0 | 2019-03-29 13:00:00 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 03.025.828.9-731.000 | CV. GRIYASHANTA | 15,999,200 | 6.4 % | |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Di Kecamatan Mantewe | Tender | Pekerjaan Konstruksi | 2149317 | 19139946 | 997,748,400 | 997,636,510 | 988,359,389 | 988,359,389 | 0 | 0 | 2019-04-29 20:00:00 | 80.541.462.0-734.000 | LESA LIMA REJEKI | 80.541.462.0-734.000 | LESA LIMA REJEKI | 9,389,011 | 0.94 % | |
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | AMDAL dan LARAP Bendungan kusan Kab. Tanah Bumbu | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2152317 | 19158720 | 2,982,450,000 | 2,896,725,700 | 2,720,382,500 | 2,706,743,600 | 0 | 0 | 2019-03-27 09:00:00 | 31.188.677.4-016.000 | PT. Arthayu Rali Perdana | 31.188.677.4-016.000 | PT. Arthayu Rali Perdana | 262,067,500 | 8.79 % | |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan rumah kaum Darul Mukminin Manurung | Tender | Pekerjaan Konstruksi | 2154317 | 21057810 | 400,000,000 | 399,994,500 | 387,400,000 | 387,375,000 | 0 | 0 | 2019-05-15 11:00:00 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 12,600,000 | 3.15 % | |
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Menuju TPU Desa Teluk Kepayang | Tender | Pekerjaan Konstruksi | 2159317 | 19128482 | 1,033,894,000 | 1,033,610,000 | 1,023,524,001 | 1,023,524,000 | 0 | 0 | 2019-04-26 10:00:00 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 10,369,999 | 1 % | |
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan di Kecamatan Kusan Hilir | Tender | Pekerjaan Konstruksi | 2169317 | 19127615 | 995,106,130 | 995,025,000 | 984,761,416 | 984,761,415 | 0 | 0 | 2019-03-29 20:00:00 | 01.879.409.9-731.000 | CV. MITRA BUANA | 01.879.409.9-731.000 | CV. MITRA BUANA | 10,344,714 | 1.04 % | |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan kapasitas Jalan Cappa Padang | Tender | Pekerjaan Konstruksi | 2172317 | 21010928 | 2,121,900,000 | 2,121,790,000 | 2,114,035,111 | 2,112,801,000 | 0 | 0 | 2019-03-29 20:00:00 | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 72.294.823.9-732.000 | CV. BAROKAH PAGURUAN | 7,864,889 | 0.37 % | |
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Optimalisasi jaringan Irigasi yang telah dibangun di desa Wonorejo dan Karang Mulyo | Tender | Pekerjaan Konstruksi | 2212317 | 19165086 | 485,660,000 | 485,623,398 | 388,500,000 | 388,500,000 | 0 | 0 | 2019-05-21 20:00:00 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 97,160,000 | 20.01 % | |
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid Agung Nurussalam Tahap II (Lanjutan) | Tender | Pekerjaan Konstruksi | 2232317 | 19135799 | 1,500,000,000 | 1,499,999,983 | 1,215,125,941 | 1,215,125,000 | 0 | 0 | 2019-07-04 18:00:00 | 03.261.609.6-734.000 | CV.MULIA JASA | 03.261.609.6-734.000 | CV.MULIA JASA | 284,874,059 | 18.99 % | |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Desa Binawara Kec.Kusan Hulu | Tender | Pekerjaan Konstruksi | 2276317 | 19134809 | 498,040,000 | 473,411,239 | 293,396,082 | 293,396,082 | 0 | 0 | 2019-07-02 21:00:00 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 204,643,918 | 41.09 % | |
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Nibung Desa Karang Indah di Angsana | Tender | Pekerjaan Konstruksi | 2277317 | 19164824 | 380,680,000 | 380,633,926 | 304,507,150 | 304,507,150 | 0 | 0 | 2019-07-02 16:00:00 | 72.058.970.4-731.000 | CV. SYAKAROMAH | 72.058.970.4-731.000 | CV. SYAKAROMAH | 76,172,850 | 20.01 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Daerah Anjir Baru Lasung | Tender | Pekerjaan Konstruksi | 2278317 | 21541216 | 911,683,659 | 911,508,200 | 617,419,679 | 617,419,000 | 0 | 0 | 2019-07-01 20:00:00 | 71.512.719.7-734.000 | CV.INTAN KIRANA BERSUJUD | 71.512.719.7-734.000 | CV.INTAN KIRANA BERSUJUD | 294,263,980 | 32.28 % | |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana Panjat Tebing Polres | Tender | Pekerjaan Konstruksi | 2289317 | 19127701 | 600,000,000 | 599,999,733 | 569,870,308 | 569,278,000 | 0 | 0 | 2019-07-31 11:00:00 | 03.286.705.3-733.000 | CV. FIRDAUS | 03.286.705.3-733.000 | CV. FIRDAUS | 30,129,692 | 5.02 % | |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Kecamatan 1 Buah | Tender | Pekerjaan Konstruksi | 2294317 | 19135737 | 2,000,000,000 | 1,999,734,076 | 1,777,624,941 | 1,777,624,941 | 0 | 0 | 2019-05-17 10:00:00 | 70.675.089.0-732.000 | CV.BORNEO RAYA | 70.675.089.0-732.000 | CV.BORNEO RAYA | 222,375,059 | 11.12 % | |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Kantor Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2296317 | 19135518 | 2,000,000,000 | 1,999,989,968 | 1,874,574,180 | 1,874,574,180 | 0 | 0 | 2019-05-17 14:00:00 | 66.142.501.7-734.000 | sewangi island | 66.142.501.7-734.000 | sewangi island | 125,425,820 | 6.27 % | |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Setiung Kec. Kusan Hilir (DAK) | Tender | Pekerjaan Konstruksi | 2302317 | 19163595 | 600,000,000 | 590,073,368 | 472,248,553 | 472,248,553 | 0 | 0 | 2019-05-21 18:00:00 | 31.642.506.5-734.000 | CV. Bumi Temposok | 31.642.506.5-734.000 | CV. Bumi Temposok | 127,751,447 | 21.29 % | |
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Sungai Danau Kec. Satui (DAK) | Tender | Pekerjaan Konstruksi | 2306317 | 19158882 | 700,000,000 | 692,552,251 | 536,688,415 | 536,688,000 | 0 | 0 | 2019-05-24 09:00:00 | 02.918.580.8-734.000 | cv. mitraintilestari | 02.918.580.8-734.000 | cv. mitraintilestari | 163,311,586 | 23.33 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Pandan Sari Kec. Karang Bintang Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2312317 | 19140752 | 350,000,000 | 349,999,924 | 321,461,053 | 321,461,000 | 0 | 0 | 2019-06-24 19:00:00 | 02.243.109.2-734.000 | CV. Dua Saudara | 02.243.109.2-734.000 | CV. Dua Saudara | 28,538,947 | 8.15 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Sungai Cuka Kec. Satui Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2313317 | 19140331 | 250,000,000 | 249,999,158 | 211,646,564 | 211,517,000 | 0 | 0 | 2019-06-24 19:00:00 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 38,353,436 | 15.34 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Beringin Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2314317 | 19140723 | 350,000,000 | 349,998,818 | 347,475,635 | 346,841,000 | 0 | 0 | 2019-06-24 19:00:00 | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 02.941.010.7-734.000 | GENERASI DUA TUJUH | 2,524,365 | 0.72 % | |
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Rantau Panjang Hilir Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2315317 | 19140664 | 525,000,000 | 524,999,330 | 474,335,707 | 474,335,000 | 0 | 0 | 2019-06-24 19:00:00 | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 50,664,293 | 9.65 % | |
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Jembatan Manggis - Insgub | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 2324317 | 19119365 | 200,000,000 | 199,850,200 | 195,662,500 | 195,662,500 | 0 | 0 | 2019-06-26 18:00:00 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 72.116.516.5-731.000 | CV. EMPAT BELAS | 4,337,500 | 2.17 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pagar POLRES Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2326317 | 19127482 | 399,975,000 | 399,834,365 | 389,274,116 | 358,698,000 | 0 | 0 | 2019-06-19 21:00:00 | 80.336.960.2-733.000 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | CV.ALFARIZQI ALESHA ZHAFRAN | 10,700,884 | 2.68 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Reservior Baja SPAM IKK Mantewe | Tender | Pekerjaan Konstruksi | 2327317 | 19141186 | 808,710,000 | 808,443,348 | 799,953,000 | 799,953,000 | 0 | 0 | 2019-06-24 12:00:00 | 02.300.423.7-734.000 | CV. HUSKOSINDO | 02.300.423.7-734.000 | CV. HUSKOSINDO | 8,757,000 | 1.08 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Jalan Desa Danau Indah | Tender | Pekerjaan Konstruksi | 2335317 | 19284766 | 2,002,687,500 | 2,002,200,000 | 1,996,694,660 | 1,996,486,000 | 0 | 0 | 2019-07-04 15:00:00 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 5,992,840 | 0.3 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Masuk Goa Liang Bangkai Kec. Mantewe | Tender | Pekerjaan Konstruksi | 2336317 | 19140058 | 2,476,937,100 | 2,476,740,000 | 2,470,842,217 | 2,469,331,000 | 0 | 0 | 2019-07-04 15:00:00 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 6,094,883 | 0.25 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Rutin Jembatan | Tender | Pekerjaan Konstruksi | 2350317 | 19110780 | 829,361,610 | 829,361,000 | 742,914,947 | 742,914,947 | 0 | 0 | 2019-07-04 22:00:00 | 02.243.099.5-734.000 | CV. KENARI INDAH | 02.243.099.5-734.000 | CV. KENARI INDAH | 86,446,663 | 10.42 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Maju Bersama Kec. Batulicin Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2354317 | 19140762 | 252,500,000 | 252,499,386 | 229,743,620 | 229,743,000 | 0 | 0 | 2019-07-09 10:00:00 | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 02.918.828.1-734.000 | CV.SABAR SUBUR MANDIRI | 22,756,380 | 9.01 % | |
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Muara Pagatan Tengah Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2355317 | 19140639 | 250,000,000 | 249,999,459 | 223,682,846 | 223,682,000 | 0 | 0 | 2019-07-09 10:00:00 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 26,317,155 | 10.53 % | |
67 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengembangan Jaringan Perpipaan SPAM Perdesaan Desa Sepunggur Kec. Kusan Hilir Kab. Tanah Bumbu (DAK) Penugasan | Tender | Pekerjaan Konstruksi | 2356317 | 19140359 | 350,000,000 | 349,999,685 | 312,576,351 | 312,576,000 | 0 | 0 | 2019-07-09 10:00:00 | 86.138.634.0-734.000 | suaka tirta banua | 86.138.634.0-734.000 | suaka tirta banua | 37,423,649 | 10.69 % | |
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Mangkalapi Kecamatan Kusan Hulu | Tender | Pekerjaan Konstruksi | 2360317 | 19135537 | 992,020,590 | 991,989,100 | 989,461,226 | 989,461,000 | 0 | 0 | 2019-08-01 19:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 2,559,364 | 0.26 % | |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Lapangan Tenis POLRES Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2366317 | 19126929 | 500,000,002 | 499,999,996 | 485,063,429 | 485,063,000 | 0 | 0 | 2019-07-31 11:00:00 | 82.333.270.5-733.000 | cv.ghea | 82.333.270.5-733.000 | cv.ghea | 14,936,573 | 2.99 % | |
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelita II Desa Kampung Baru Kecamatan Simpang Empat | Tender | Pekerjaan Konstruksi | 2369317 | 19174637 | 330,000,000 | 329,777,900 | 327,877,138 | 327,513,000 | 0 | 0 | 2019-07-24 12:00:00 | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 74.808.327.6-734.000 | CV. Perdana Abadi Lestari | 2,122,862 | 0.64 % | |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Serba Guna (MY) | Tender | Pekerjaan Konstruksi | 2378317 | 21868766 | 8,500,000,000 | 8,499,657,476 | 7,561,473,045 | 7,561,473,044 | 0 | 0 | 2019-09-10 18:00:00 | 02.043.146.6-731.000 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | CV.PUTRA LIDYS | 938,526,955 | 11.04 % | |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Kecamatan Kusan Hilir (MY) | Tender | Pekerjaan Konstruksi | 2379317 | 21864782 | 2,000,000,000 | 1,999,989,968 | 1,750,061,940 | 1,750,061,940 | 0 | 0 | 2019-09-11 10:00:00 | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 03.218.611.6-734.000 | CV. KARYA BERSINAR MANDIRI [KBM] | 249,938,060 | 12.5 % | |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Akses Lokasi MTQ Desa Suka Damai Kec. Mantewe | Tender | Pekerjaan Konstruksi | 2382317 | 21872123 | 958,110,000 | 958,110,000 | 956,615,080 | 944,756,000 | 0 | 0 | 2019-08-29 18:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 1,494,920 | 0.16 % | |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Manurung - Batarang - Sungai Binjai | Tender | Pekerjaan Konstruksi | 2394317 | 19127221 | 750,200,000 | 750,197,000 | 746,676,423 | 746,560,000 | 0 | 0 | 2019-09-06 09:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 91.744.784.9-734.000 | Indo Tama Jaya | 3,523,577 | 0.47 % | |
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan jalan pusat perkantoran tahap II Kelurahan Gunung Tinggi | Tender | Pekerjaan Konstruksi | 2399317 | 22006999 | 1,500,000,000 | 1,500,000,000 | 1,493,092,331 | 1,493,092,330 | 0 | 0 | 2019-10-08 18:00:00 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 6,907,669 | 0.46 % | |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dusun Indra Brata Kec. Sungai Loban | Tender | Pekerjaan Konstruksi | 2401317 | 22034499 | 743,081,130 | 743,081,130 | 737,143,629 | 737,143,000 | 0 | 0 | 2019-10-08 18:00:00 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 5,937,501 | 0.8 % | |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan jalan Mangkalapi - Temunih | Tender | Pekerjaan Konstruksi | 2402317 | 22023264 | 600,000,000 | 600,000,000 | 597,541,041 | 597,541,000 | 0 | 0 | 2019-10-08 18:00:00 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 2,458,959 | 0.41 % | |
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Desa Karang Rejo | Tender | Pekerjaan Konstruksi | 2403317 | 22011494 | 361,120,000 | 361,120,000 | 358,510,998 | 358,510,998 | 0 | 0 | 2019-10-08 18:00:00 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 2,609,002 | 0.72 % | |
79 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Parkir Lapangan Tembak Mapolres Tanah Bumbu | Tender | Pekerjaan Konstruksi | 2405317 | 21901546 | 1,100,000,000 | 1,100,000,000 | 1,065,477,961 | 1,037,000,000 | 0 | 0 | 2019-10-07 16:00:00 | 01.222.215.4-734.000 | CV. Dewi Indah | 01.222.215.4-734.000 | CV. Dewi Indah | 34,522,039 | 3.14 % | |
80 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Api-api - Muara Tengah | Tender | Pekerjaan Konstruksi | 2406317 | 19127464 | 1,000,976,130 | 1,000,976,130 | 997,469,644 | 996,909,000 | 0 | 0 | 2019-10-10 17:00:00 | 91.756.512.9-734.000 | Citra Berkah Nusantara | 91.756.512.9-734.000 | Citra Berkah Nusantara | 3,506,486 | 0.35 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |